BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated August 29, 2026

Renovation of a multi-residential development in Chicago, Illinois. Completed plans call for the renovation of a multi-residential development.

Project has been Rebid 1312-16 S Harding Ave, Chicago IL. 60632 The project scope of work is for interior and exterior renovation of the apartments located at 1312-16 S. Harding Avenue. All 18 existing units are currently unoccupied. The Harding Apartments consist of a three-story masonry structure with Level 1 concrete floor slab, Level 2 & 3 wood floor joists and wood truss roof. It is approximately twenty-six feet (26') from grade to the roof edge at the east, west, and south facades. The main entrance is located at the east elevation and accessed via a sidewalk from South Harding Avenue. There are currently 18 residential units, 6 per floor, accessed from a new enclosed interior stair from the primary entrance and a new rear stair. 1323-39 S Kedzie Ave, Chicago IL. 60632 The project scope of work is for interior and exterior renovation of the apartments located at 1323-39 S. Kedzie Avenue. All 18 existing units are currently unoccupied The Kedzie Apartments consist of a three-story masonry structure with Level 1 concrete floor slab, Level 2 & 3 wood floor joists and wood truss roof. It is approximately twenty-six feet (26') from grade to the roof edge at all four facades. The main entrance is located at the west elevation and accessed via a sidewalk from South Kedzie Avenue. There are currently 18 residential units, 6 per floor, accessed from a new enclosed interior stair from the primary entrance and a new rear stair. The work for the two properties includes but is not limited to exterior improvements of all facades including the new enclosed main and rear entrances, new parking lot, walkways, patio, fencing and landscape. Interior alterations include new electrical HVAC systems, new electrical service and distribution, and new plumbing systems and fixtures. New interior finishes include new studs, drywall , paint, flooring, doors and hardware, kitchen layout, casework, and lighting. Each unit will have its own mechanical room. Roofing improvements per new MEP. All appliances will be furnished and installed by the CHA. Questions may be submitted through CHA's Supplier Portal or in writing to the Procurement Specialist as shown above by no later than 11:00 AM (CT) on Wednesday, June 3, 2026. Question Deadline 08/20/2026 at 11:00 AM CT Questions may be submitted through CHA's Supplier Portal or in writing to the Procurement Specialist tlipsey@thecha.org MBE/WBE/DBE - 30%

GC Bidding

Multi-Residential

$4,940,825.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

33

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
246
Bidding Soon
3,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

January 28, 2027

Project location map

Multiple Locations, Chicago, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.