Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Springfield, Missouri. Contact the soliciting agency for additional information.
One transformer to James River Substation, 5701 S. Kissick Ave., Springfield, Missouri 65810 City Utilities of Springfield, Missouri is a municipal utility governed by the Board of Public Utilities of Springfield, Missouri. City Utilities is engaged in the production and distribution of electricity, distribution of natural gas, the treatment and distribution of water, provision of commercially available broadband services and the provision of public transportation services for the City of Springfield and the surrounding area. Since City Utilities is an component part of the City of Springfield, Missouri a Missouri municipal corporation, the laws of the state of Missouri shall apply and control any contract which is awarded. When the term "City Utilities of Springfield, Missouri", "City Utilities" or "CU" is used in this document, it shall refer to the City of Springfield, Missouri, a municipal corporation, operating its public utilities through the Board of Public Utilities. Transformer will have rating of 69 kV to 13.6/7.85 kV, 22.5/30/37.5 MVA at 65C, power transformer, in accordance with the provisions of this specification. Also included in the scope of work is field assembly, oil filling and on-site testing with an expected completion such that the Transformer is ready for energization by October 31, 2026. Transformer will be connected to Battery Storage System which will have bi-directional flows across Transformer due to charging/discharging cycles. Proposals will not be publicly opened or read since the selection process will be determined based upon competitive negotiated procurement procedures for proposals as described in this RFP. All proposals shall be irrevocable for ninety (90) days after the time for opening of proposals. 5. Anticipated decision and selection of Vendor 9/05/2024 6. Required Delivery Date 10/02/2026 7. Later Delivery Penalty Start Date 10/03/2026 All requests for interpretations must be received by the Purchasing Department no later than the five (5) calendar days prior to the proposal opening. Questions should be directed to:James Griffith james.griffith@cityutilities.net Purchasing Department City Utilities of Springfield, Missouri [P] (417) 831-8946 [F] (417 831-8377 . Each proposal must be accompanied by a Bid Bond with an adequate surety, naming the City Utilities of Springfield, Missouri, as obligee, in a penal sum equal to five percent of the maximum bid price excluding options, or in lieu thereof, a certified check drawn on a Federally insured banking institution, payable to City Utilities in the same amount as the penalty of the Bond. The Bond or Check shall be conditioned that should a bidder, after award, fail to enter into a contract, then the entire amount of the Bond or Check shall become the property of the City Utilities, or City Utilities shall be entitled to recover the entire penal sum of the Bond or Check without further proof of damage. Bid Checks will be returned to all unsuccessful bidders within a period of thirty days following contract execution.
Post-Bid
Power Plant
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2024
September 28, 2024
5701 S Kissick Ave, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Sep 27 2024
Springfield, MO
Bid Date: Nov 13 2024
Springfield, MO
Bid Date: Aug 14 2024
Springfield, MO
Bid Date: Jul 30 2024
Springfield, MO
Bid Date: Aug 21 2024
Springfield, MO
Bid Date: Aug 01 2024
Springfield, MO
Bid Date: Aug 20 2024
Springfield, MO
Bid Date: Aug 02 2024
Springfield, MO
Bid Date: Aug 15 2024
Springfield, MO
Bid Date: Jul 23 2024
Springfield, MO
Bid Date: Aug 14 2024
Springfield, MO
Bid Date: Aug 15 2024
Springfield, MO
Bid Date: Aug 02 2024
Springfield, MO
Bid Date: Jul 30 2024
Springfield, MO
Bid Date: Jul 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.