BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Eddyville, Kentucky. Completed plans call for the renovation of a detention facility.

The project is the completion of the renovation of the Yard Shower facility at Kentucky State Penitentiary. The facility is located in the Ground Level of the Laundry Building. Work includes steel stud wall framing, detention-grade doors and windows, painting, shower enclosures, dressing benches, piping and plumbing fixtures, HVAC units, electrical lighting, and power. Question Deadline 08/09/2024 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered. ACCOUNT NO. 527-CA2N-SP-3900 Estimated Length of Project: 150 (Substantial Completion) + 30 (Final Completion) To attend this site visit meeting, you must have a NCIC background check. The NCIC background check form is in the spec book. The form must be emailed to Jeremey Belt, Jeremey.belt@ky.gov no later than 8-01-24, 3:00 PM, Central Time. If your background check is not turned in by this date you will not be permitted to enter the facility. No questions will be answered at the site visit. All technical questions shall be emailed to the architect/engineer of record for this project. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business by the Kentucky Secretary of State and the Kentucky Department of Insurance within the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

Award

Jails / Prisons

$1,998,443.00

Public - State/Provincial

Renovation

23

19

15

14

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
24
Bidding Soon
621
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

266 Water St, Eddyville, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.