Published November 4, 2024 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Beaver Falls, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: The furnishing of all labor, material, plant, utilities, and services required for the construction of the Route 51 Pump Station Upgrades. Bids are requested for the Owner anticipates that the Project's total bid price will be approximately $1,675,000.00 for 2024-01A and $1,145,000.00 for 2024-01B. The Project has an expected duration of six hundred forty (640) days. The Owner herby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are located in Section 01000. All questions are due by 4:30 P.M. on Friday, September 20, 2024. Work under Contract 2024-01A and 2024-01B covers the furnishing of all labor, material, plant, utilities, and services required for the construction of the Route 51 Pump station Upgrades. The project is in Patterson Township, Beaver County 1. All site work and yard piping installation required to accommodate operations of the existing facility during construction of the proposed improvements. 2. All electrical construction and equipment installation is required to facilitate operations of existing and temporary equipment during construction of proposed improvements. 3. All temporary pumps, piping, and appurtenances are required to maintain the operation of the pump station during construction of the proposed improvements. The CONTRACTOR shall be responsible for always maintaining wastewater flow through the pump station, either through sequencing of construction, utilization of existing or new pumps, or through bypass pumping. Any temporary shutdowns, bypass pumping, or changes in wastewater flow shall be coordinated in communication with the OWNER. 4. Contract 2024-01A - The demolition of the existing pump station structures, including, but not limited to: a. Removal of existing pumps, associated valves, piping and concrete bases. b. Removal of magnetic flow meters and other valves and piping. Removal of the Air/Vacuum Release Valve and associate piping. c. Removal of the wet well intake and exhaust fans and ducts. d. Demolition of the existing wet well chamfers, and new cores into through the existing wet well - dry well wall. e. Removal of existing sump pumps and sump pump piping. 5. Contract 2024-01A - The excavation required for all new construction including but not limited to: a. Excavation required for the installation of all valves, fittings, and piping associated with bypass valve assembly. 6. Contract 2024-01A - The installation of new pumps stations equipment and all appurtenances thereto, including but not limited to: a. Installation of new raw sewage pumps, inclusive of new concrete pump bases. b. Installation of associated piping, valves, fittings, and piping appurtenances. c. Flow meter and associated piping, valves, and fittings. d. Air/Vacuum and Surge Release valve and all associated piping, valves and fittings. e. HVAC equipment, and HVAC equipment structural supports. f. Sump pumps and all associated piping and valves. 7. Contract 2024-01B - The demolition, removal, or relocation of existing pump station equipment, including but not limited to: a. Control Panels (bubbler and gas monitor) b. Motor Control Center c. Wiring and Conduit d. Pumps e. Ground Straps for Pump Bases f. Control Valve Panels g. Sump Pump Control Panel h. Generator i. Automatic Transfer Switch 8. Contract 2024-01B - The installation of new pump station electrical equipment and all appurtenances thereto, including but not limited to: a. Temporary Power and Control Facilities b. Control Panels c. Instrumentation d. Motor Control Center e. Variable Frequency Drives f. Wiring and Conduit g. Ground Straps for Pump Bases h. Sump Pump Control Panel i. Generator j. Automatic Transfer Switch Bid-Results:- 1. TOTAL BID AMOUNT-2024-01A-Kukurin Contracting, Inc.-$ 1,524,425 2. TOTAL BID AMOUNT-2024-01B-McCurley Houston Electric, Inc-$ 670,000

Award

Water / Sewer

$2,194,425.00

Public - City

Renovation, Site Work

27

19

6

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Water Repellents, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
124
Bidding Soon
1,298
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

November 29, 2024

img_map_placeholder

501 Constitution Blvd, Beaver Falls, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Route 51 Pump Station Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.