Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2024 at 8:00 PM
Updated September 18, 2024
Site work, paving and renovation of a mixed-use development in Crystal Lake, Illinois. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
**As of September 6, 2024 this project has not yet been awarded. A timeline for the award has not yet been established.** Any alterations or modifications to the work specified herein shall be made only by written agreement between the Bidder and the Park District and shall be made prior to commencement of any such alternations or modifications. No claims for any extra work or materials will be allowed unless covered by written agreement. All bidders will submit, separate from the sealed bid, resume of similar projects performed, enumerated, as to location, type of work, approximate completion date, and project engineering firms. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. The work for which proposals are requested will generally consist of, but shall not be limited to, the following: Removal of existing shelter canopy structure and concrete base, earth excavation; concrete sidewalk installation, asphalt pathway installation; installation of shelter canopy structure and other associated improvements. All restoration is to be completed to within 0.5" of final grade of hard scape. Bid security in the form of a Bid Bond, Bank Cashier's Check, or Certified Check in the amount of TEN (10)percent of the total bid amount, made payable to the Crystal Lake Park District shall accompany the bid. The Crystal Lake Park District reserves the right to acceptor reject any bid, to award all or part of a contract, and to make such awards as are in the best interests of the Park District. Construction work is anticipated to be awarded by the Park District board of directors on August 15, 2024, with substantial completion by October 25, 2024, and a final completion date of May 23, 2025.
Award
Playgrounds / Parks / Athletic Fields
$825,000.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2024
September 26, 2024
180 Midlane Dr, Crystal Lake, IL
Related To This Project
Crystal Lake, IL
Bid Date: Aug 20 2024
Crystal Lake, IL
Bid Date: Aug 06 2024
Crystal Lake, IL
Bid Date: Aug 06 2024
Crystal Lake, IL
Bid Date: Sep 16 2024
Crystal Lake, IL
Bid Date: Aug 30 2024
Crystal Lake, IL
Bid Date: Sep 19 2024
Crystal Lake, IL
Bid Date: Aug 29 2024
Crystal Lake, IL
Bid Date: Sep 05 2024
Crystal Lake, IL
--
Crystal Lake, IL
Bid Date: Jul 17 2024
Crystal Lake, IL
Bid Date: Jul 23 2024
Crystal Lake, IL
--
Crystal Lake, IL
--
Crystal Lake, IL
Bid Date: Jul 02 2024
Crystal Lake, IL
Bid Date: Aug 02 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
