Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Site work and paving for a road / highway in Fairview, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Street Maintenance & Repairs. There will not be a pre-bid conference. 1. The work generally consists of: Installation of a new valley gutter, replacement of 95 LF of curb and gutter, and approximately 2,600 SF off full depth replacement of existing asphalt and crushed road base and 950 SF of asphalt mill and overlay. Asphalt replacement may require subgrade modifications. B. SCHEDULE 2 (7TH & CENTRAL): 1. The work generally consists of: Approximately 1,500 SF off full depth replacement of existing asphalt and crushed road base. Asphalt replacement may require subgrade modifications. C. SCHEDULE 3 (6TH & ELLERY): 1. The work generally consists of: Replacement of 85 LF of curb and gutter and approximately 5,900 SF off full depth replacement of existing asphalt and crushed road base. Asphalt replacement may require subgrade modifications. D. SCHEDULE 4 (5TH & MONTANA): 1. The work generally consists of: Replacement of an existing valley gutter, replacement of 95 LF of curb and gutter, and approximately 10,700 SF off full depth replacement of existing asphalt and crushed road base. Asphalt replacement may require subgrade modifications. Est. Completion Date: Nov. 1, 2024. Site Directions: 6th & Pleasant; 7th & Central; 6th & Ellery; and 5th & Montana

Award

Roads / Highways

$466,428.00

Public - City

Paving, Site Work

14

11

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
11
Bidding Soon
118
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 5, 2024

Project location map

Multiple Locations, Fairview, MT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed