BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Demolition, site work, renovation and addition to a transportation facility in Gainesville, Florida. Design plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

As of July 24, 2025, an engineer has been selected, and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Pursuant to the Consultants' Competitive Negotiations Act Chapter 287.055 Florida Statutes The Gainesville-Alachua County Regional Airport Authority is seeking qualified consultants to provide professional engineering services for planned expansion of the Commercial Terminal Aircraft Apron located at 3880 N.E. 39th Ave., Gainesville, FL. The anticipated expansion is approximately 10,000 square yards in area to be constructed of PCC with associated stormwater and drainage improvements. Design is anticipated to begin by the first quarter of 2025 and be completed by the end of 2025. Construction is anticipated to begin in late 2026, pending issuance of state and federal grants. The successful proposer will show prior experience in similar airport facilities and familiarity with applicable FAA Advisory Circulars. This is a qualifications-based selection process. The Gainesville-Alachua County Regional Airport Authority reserves the right to reject any and all proposals submitted in response to this Request for any reason. Interested parties are advised that contact with Evaluation Committee members, Airport Authority members and Airport Authority employees, regarding Requests for Qualification (RFQ), Bids or Contracts is strictly prohibited from the point of advertisement until a final award is made or protest is resolved. Interested parties should send a written request for a copy of the RFQ Package to: Ms. Lynn Noffsinger, Grants and Contracts Administrator Gainesville Regional Airport 3880 NE 39th Avenue, Suite A Gainesville, FL 32609 Deadline for Receipt of Questions: Friday, August 23, 2024 5:00 p.m. Interviews/Presentations: Tuesday - Thursday, September 17 - 19, 2024 An attempt will be made to schedule all presentations on the same day. Times will be assigned Alphabetically. Target Award by GACRAA Board: Thursday, September 26, 2024 Statements of Qualifications not adhering to the required format, minimum terms or other requirements of the RFQ may be rejected as "non-responsive". GACRAA reserves the right to waive any informality or irregularity in any proposal it receives and to be the sole judge of the merits of the proposals it receives. DBE firms are encouraged to apply. It is required that any entity interested in submitting a proposal contact Lynn Noffsinger directly.

Design

Transportation Terminals

$6,400,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
110
Bidding Soon
1,458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

3880 NE 39th Ave, Gainesville, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.