BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Byron, Georgia. Completed plans call for the renovation of a laboratory facility.

A. Project Title: Replace - Upgrade Restroom Fixtures & Plumbing. B. Competition is set aside for Small Businesses. Applicable NAISC is 238220 Plumbing, Heating, and Air Conditioning Contractors. C. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $25,000 and $100,000. D. Prospective offerors shall complete block 14, 15, and 19. E. Prospective offerors shall be registered with System for Award Management (SAM) with an active registration. 1) GENERAL REQUIREMENTS: a) Work consists of providing all labor, materials & equipment asrequired to replace outdated, unserviceable bathroom fixtures, faucets & flushometerslocated at Southeastern Fruit & Tree Nut Research Laboratory (SEFTNRL), Byron, GA. Contractor must possess a current Plumbing License issued by the State of Georgia. 2) COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: a) Upon acceptance, the contractorshall commence work NLT fifteen (15) days after notice to proceed. Contractor will schedule work at Building 13 (Primary Maintenance Shop) and will not proceed to next scheduled building until all work is complete. Work diligently to complete the entire project to be work ready for use within 30 working days of notice to proceed. SCOPE OF WORK a) Bldg. 660605B013 Primary Maintenance Shop. i) Remove and dispose of old mop sink located in maintenance shop, install new drop in sink, new cabinet for storage, replace 3" P-trap with standard trap, install high rise faucet and in addition shut offs will need to be replaced. ii) Remove and dispose of wall hung sink in maintenance shop restroom and install new wall hung sink with automatic faucet, new P-Trap and in addition shut off's will need to be replaced. iii) Remove and dispose of male urinal in maintenance shop restroom and install new urinal with automatic flush valve iv) Remove and dispose of toilet in maintenance shop restroom and install new American Standard ADA compliant toilet with open front seat and an automatic flush valve. b) Bldg. 660605B015 - Farm Center Office restroom i) Replace manual flushometers on two urinals with Sloan Sensor Retrofit kit or similar ii) Remove and dispose of two toilets in maintenance and install new American Standard ADA compliant toilets with open front seat and an automatic flush valve. iii) Remove and dispose of 2 wall hung sinks and install new wall hung sink with automatic faucets, new P-Traps and in addition shut offs will need to be replaced. c) Bldg. 660605B001 Main Laboratory Auditorium Men and Women Restrooms i) Remove and dispose of wall hung sinks in both the Men and Women Restrooms and install new wall hung sinks with automatic faucets, new P-Traps and in addition shut offs will need to be replaced. ii) Replace manual flushometers on two toilets with Sloan Sensor Retrofit kit or similar d) Bldg. 660605B001 Main Laboratory 1st Floor Men and Women Restrooms i) Men's restroom - replace manual flushometers on one urinal and two toilets with Sloan Sensor Retrofit kit ii) Men's restroom - remove and dispose of wall hung sink and install new wall hung sink with automatic faucet, new P-Trap and in addition shut offs will need to be replaced. iii) Women's restroom - replace manual flushometers on two toilets with Sloan Sensor Retrofit kit or similar iv) Women's restroom - remove and dispose of two wall hung sink and install new wall hung sinks with automatic faucets, new P-Traps and in addition shut offs will need to be replaced. e) Bldg. 660605B001 Main Laboratory 2nd Floor Men and Women Restrooms i) Men's restroom - replace manual flushometers on two urinals and three toilets with Sloan Sensor Retrofit kit ii) Men's restroom - Remove and dispose of one cracked male urinal and install new urinal with automatic flush valve iii) Men's restroom - remove and dispose of 4 wall hung sinks and install new wall hung sinks with automatic faucets, new P-Traps and in addition shut offs will need to be replaced. iv) Women's restroom - replace manual flushometers on 4 toilets with Sloan Sensor Retrofit kit or similar v) Women's restroom - remove and dispose of four wall hung sinks and install new wall hung sinks with automatic faucets, new P-Traps and in addition shut offs will need to be replaced. Period of Performance: 08/14/2024 to 09/30/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Laboratories

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
75
Bidding Soon
979
All Active Projects
449
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 9, 2024

August 14, 2024

September 30, 2024

img_map_placeholder

21 Dunbar Rd, Byron, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.