BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2024 at 8:00 PM

Updated November 18, 2025

Site work and paving for a road / highway in Byron, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete construction of a Roundabout at the intersection of White Road and Peavy Road. The time allotted for final completion of work is 240 consecutive calendar days from the Notice to Proceed. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid. Permits: GDOT Encroachment and Access permit supplied by the Owner. Contractor to furnish necessary permits for Construction of Work including but not limited to the Notice of Intent (NOI) and Land Disturbance Permit. Easements: The Owner has acquired all necessary easements and rights-of-way for permanent installations. Reservation of Rights: The Owner reserves the right to reject any or all Bids, to waive informalities and to re-advertise. Contractor E-verify: Contractor shall supply E-Verify documentation with the bid to be deemed responsive.

Award

Roads / Highways

$1,981,319.00

Public - City

Paving, Site Work

44

10

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
51
Bidding Soon
910
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

November 4, 2024

Project location map

W White Rd & Peavy Rd, Byron, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.