Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2024 at 8:00 PM

Updated October 22, 2024

Site work for a water / sewer project in Dobbin, Texas. Completed plans call for site work for a water / sewer project.

Wastewaster treatment plant construction Each bid proposal must be accompanied by a Bid Bond from a reliable surety company drawn to the order of Montgomery County MUD 213 in the amount of five percent (5%) of the total bid. No bid proposal may be withdrawn for a period of sixty (60) days after the bid opening date. OWNER reserves the right to reject any or all bids or to accept the bid deemed most advantageous to it. The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract. Major items of construction and services required are designated as follows: i. Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances ii. Construct and adjust sanitary sewer, manholes, and appurtenances iii. Repair existing pavement affected iv. Furnish and install all subsidiary items as necessary to complete the project v. Perform testing as specified on installed lines vi. Clean-up project area upon completion Custom Bid Results BID 1: CONVENTIONAL Sequeira Civil Construction - 2,006,200 BID 2-A: PLANT LEASE PURCHASE Sequeira Civil Construction - 900,350

Bid Results

Water / Sewer

$2,906,550.00

Public - County

Site Work

21

16

15

9

Subscribe For Documents

119 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
265
Bidding Soon
3,939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 28, 2024

Project location map

To Be Determined, Dobbin, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed