Site work and paving for a mixed-use development in Vista, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work generally consists of: all street, traffic, signing and striping improvements required for protected green bike lanes; including installation of all striping as shown on plans, including but not limited to: green solid paint, green dashed conflict paint, white paint edge, white paint markings (bike, person, arrow, stop, sharrow etc.), white bike buffer zone paint, white lane lines, yellow no passing lines, channelizing lanes, centerlines; also including the installation of AC berms, post delineators, pedestrian ramps, new sign posts, new sign on existing post, traffic signal loops, removal of existing signs and/or posts, and removal with AC grinding of all existing paint that conflicts with new bike paint; and other related improvements as shown per plans. The Work to be constructed is located on the following streets in the City of Vista, California. Base Bid (Protected Bike Lanes CIP 8362) o Bobier (from N Santa Fe Ave to E Vista Way; 3 sheets) o E Vista Way (from Civic Center Drive to Taylor Street; 5 sheets) o N Melrose Drive (from Olive Ave to North Ave; 3 sheets) o N Santa Fe (from Vista Village Drive to E Bobier Drive; 3 sheets) o S Melrose Drive (from Lionshead Ave to Matagual Drive; 8 sheets) o Sycamore Ave (from S Melrose Drive to Green Oak Road; 3 sheets) o Taylor Street (from N Santa Fe Ave to Cresthaven Drive; 2 sheets) o Vista Village Drive (from W Vista Way to Hillside Terrace; 3 sheets) Bid Alternate 1 (Protected Bike Lanes - Olive CIP 8362) o Olive Avenue (from N Emerald Drive to Vista Village Drive; 6 sheets) Bid Alternate 2 (Green Bike Lanes CIP 8294) o 1- Lupine Hill Drive (from Live Oak Road to Oak Glen Drive) o 2- Lupine Hill Drive (from Miramar Drive to Countrywood Lane) o 3- Lupine Hill Drive (from Countrywood Lane to Chaparal Drive) o 4- Lupine Hill Drive (from Turnberry Drive to Shadowridge Drive) o 5- Live Oak Road (from S Melrose Drive to Oak Glen Drive) o 6- Live Oak Road (from Oak Glen Drive to Saint Tropez Drive) o 7- Live Oak Road (from Lupine Hill Drive to Cordoba Way) o 8- Live Oak Road (from Brewly Lane to Shadowridge Drive) o 9- Lupine Hill Drive (from Shadowridge Drive to Harbor Drive) o 10- Lupine Hill Drive (from Parkview Drive to Dundee Way) o 11- Lupine Hill Drive (from Links Way to Optimist Way) o 12- Lupine Hill Drive (from Lantana Way to Shadowridge Drive) o 13- Shadowridge Drive (from S Melrose Drive to Live Oak Drive) o 14- Shadowridge Drive (from Live Oak Drive to Columbus Way) o 15- Shadowridge Drive (from Columbus Way to Lupine Hill Drive) o 16- Shadowridge (from Lupine Hill Drive to 760 Shadowridge) o 17- Shadowridge Drive (from 760 Shadowridge to Sycamore) o 18- Sycamore Avenue (from University Drive to Shadowridge Drive) o 19 through 22 - not included o 23- Business Park Drive (from Joshua Way to Park Center Drive) o 24- Business Park Drive (from Scott Street to Liberty Way) o 25- Business Park Drive (from Keystone Way to Lionshead Avenue) o 26- S Santa Fe Avenue (from Mar Vista Drive to Service Place) o 27- S Santa Fe Avenue (from monte vista Drive to Postal Way) o 28- S Santa Fe Avenue (from Postal Way to Civic Center Drive) o 29- Civic Center Drive (from Ocean View Drive to Eucalyptus Avenue) o 30- W Vista Way (from Cedar Road to N Emerald Drive) o 31- W Vista Way (from Huff Street to Hill Drive) o 32- W Vista Way (from Santa Barbara Way to Brass Lane) o 33- W Vista Way (from n Melrose Drive to Vista Village Drive) o 34- Olive Avenue (from N Emerald Drive to Grapevine Road) o 35- Olive Avenue (from Granada Drive to Brookins Lane) o 36- Olive Avenue (from Bonita Drive to Maryland Drive) o 37- Olive Avenue (from Maryland Drive to N Melrose Drive) o 38- W Bobier Drive (from City Limit to Bobolink Drive) o 39- W Bobier Drive (from W Knapp Drive to N Santa Fe Avenue) o 40 through 42 - not included A Pre-Bid Meeting will not be held for this project. Question Submission Deadline: August 20, 2024, 2:00pm All questions must be submitted through electronically at least five (5) Working Days prior to the date fixed for opening of bids. In accordance with the provisions of the California Public Contract Code Section 3300, the Agency has determined that the Contractor shall be required to possess a valid California Class A General Engineering Contractor License(s) at the time that the Contract is awarded, and shall maintain said license(s) in good standing at all times during performance of the Work. The Engineer's Opinion of Probable Construction Cost for this Project is Two Million, One Hundred Ninety-Five Thousand Dollars ($2,195,000.00) for the Base Bid items, Three Hundred FortyEight Thousand Dollars ($348,000.00) for the Alternate 1 Bid Items, and Five Hundred TwentySeven Thousand Dollars ($527,000.00) for the Alternate 2 Bid Items. All work shall be completed in every detail to the satisfaction of the Agency within [One Hundred (100 days)] Working Days for all Base Bid item work if awarded, along with an additional [Twenty (20 days)] Working Days for Alternate 1 item work if awarded, and an additional [Thirty five (35 days)] Working Days for Alternate 2 item work if awarded, after the date of the NOTICE TO PROCEED.

Award

Roads / Highways

$2,202,614.00

Public - City

Paving, Site Work

38

8

4

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
98
Bidding Soon
2,258
All Active Projects
989
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.