BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2024 at 8:00 PM

Updated September 6, 2024

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000358454 The Work to be performed under the 2024 PRV Vault Improvement Project consists of furnishing all labor, materials equipment, tools, supplies including the demolition of old structures and installation of new cast in place and or pre-cast concrete vaults to increase access & maintenance sizes on various existing PRV Valve water vaults throughout the City of Aurora. The Pressure Relief Valve (PRV) & pipe work will be in the range of 6, 8 and 12 sizes. The Vaults will generally be in the 6 to 8 diameter precast sizes with one site requiring a 6 x 12 vault. The pipe materials will involve cast iron, Ductile Iron, & PVC pipe. The various sites will include high traffic volume roadways, excavation in the range of 8 to 10 in depth and dry utility coordination. Examples of subcontracting opportunities could include; Construction Videography, Surveying, Concrete placement, Asphalt placement, Traffic Control, Painting, Roadway Striping, Landscape replacement, etc. There will be a Special Outreach Meeting that is Open to Disadvantaged Business Enterprises (DBEs) for both Potential Prime Contractors and interested DBE Subcontractors on August 13, 2024 at 10:00 AM at the Aurora Water's South East Area Maintenance Facility located at 26791 E Quincy Ave, Aurora, CO 80013. This non-mandatory meeting will be held in the Wild Horse Conference Room. All interested parties shall check in at the front desk. (See map attached) Question Deadline 08/20/2024 at 2:00 PM MT Questions are submitted online No, All questions shall be submitted in writing to John Bruneau, Project Manager, via email at jbruneau@auroragov.org AND Nathan Jones, Contract Administrator, via email at njones@auroragov.org. Telephone inquiries will be accepted only for procedural questions by calling Nathan Jones at 303-739-7343. The allocated budget for this work is set at $4,000,000.

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Site Work

3

3

2

7

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
63
Bidding Soon
1,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.