BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Site work and paving for a road / highway in Springtime, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction and roadway widening to address roadway departure crashes. Project is in Stillwater County on Secondary 421 from five to seven miles southeast of the junction with Highway 78. The reconstruction portion of the project begins at RP 4.8 and ends at RP 5.9. The rumble strip only portion of the project begins at RP 5.9 and ends at RP 6.9. There will be some guardrail work done to existing guardrail withing the rumble strip only portion of the project. The completed project will improve the horizontal and vertical alignments and improve sight distance throughout the length of the project. Contract to be completed as outlined in the Contract Time special provision found in the proposal. This project is under the jurisdiction of the Butte District Administrator. Uniform No. 9116000 MT DOT - Call Order 101 - SF 159 SE Columbus Shldr Wid Notice to Proceed. The notice to proceed will be issued with an effective date of August 15, 2025.

Award

Roads / Highways

$3,412,738.00

Public - State/Provincial

Paving, Site Work

145

9

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Secondary 421, Springtime, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.