BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a road / highway in Lodge Grass, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Lodge Grass - South project will apply a full width mastic crack seal and seal and cover to approximately 12 miles of Interstate 90. In addition, where necessary, digouts will be utilized to remove and replace sections of surfacing that are too damaged to apply a seal and cover. The project is located on Interstate 90, beginning at RP 528.65 near the Co. Rd. No. 97 Separation Structure bridges, and ending at RP 543.5, approximately 1 mile north of Wyola. The project is located entirely within the Crow Reservation in Big Horn County. Contract to be completed as outlined in the Contract Time special provision found in the proposal. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10220000 Value - $1,000,000 - $5,000,000 MT DOT - Call Order 206 - Lodge Grass-South - Interstate 90 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 10/20/2025 at 10:00 AM MT https://www.mdt.mt.gov/business/contracting/qacurrent.shtml on the Monday before the bid letting

Award

Roads / Highways

$2,873,311.00

Public - State/Provincial

Paving, Site Work

43

11

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
12
Bidding Soon
187
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

July 6, 2026

Project location map

I-90, Lodge Grass, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.