BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Marshall, Arkansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

BIDDERS ARE ADVISED that BUY AMERICA PROVISIONS apply to this contract. The Arkansas Department of Transportation Standard Specifications for Highway Construction, latest edition, Section 106 contains the requirements and restrictions for Buy America. 23 CFR 635.410 contains all federal requirements for Buy America. Please call first at 870-448-6559. The Bobcat Trail will be 7,810 LF of non-motorized, multi-use, and multi-directional natural surface trail on the north side of the adjacent airport runway with a trailhead and gravel parking area with a four foot by four-foot informational sign. The trail will have multiple jump features, where suitable, and also have alternate routes around the jump features. The owner's target date for trails being substantially complete is 9 months from the project commencement. All cutting and removal of trees on the trail can only happen during the period of 16 November 2024 till 14 March2025, due to bat activity, so that work must commence and be completed in the 16 November,2024 to 14 March, 2025 window. It has been designed and will be built with thought given to user experience, mitigating user conflicts, signage placement, and decreasing the impact on the property. With a tread width of24"-36" and a corridor width of approximately 10'-12', this trail will comply with the IMBA best practices for building sustainable trail. Includes removal of debris and vegetation, construction of trail surface and such other work as may be necessary to complete the Work as specified in the contract(s) ultimately let to do the Work (in each case, a "Construction Contract"), the components of which are described in this RFB(collectively, the "Contract Documents"), including (but not limited to) the plans and specifications which are set out in the Construction Documents (collectively, the "Plans and Specifications"). Plans and specifications may be picked up from the office of Buffalo River Community Development Corporation, 3262 South Highway 27, Marshall, AR 72650. Please call first to 870-448-6559.

Post-Bid

Sidewalks / Parking Lot

$530,000.00

Public - City

Paving, Site Work

9

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
15
Bidding Soon
134
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

November 16, 2024

img_map_placeholder

Multiple Locations, Marshall, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.