BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2024 at 8:00 PM

Updated August 1, 2024

This is a service / maintenance or supply contract in Salt Lake City, Utah. Contact the soliciting agency for additional information.

The District is a wholesale provider of treated water to Salt Lake City Public Utilities Department, Sandy City Public Utilities Department, and others. The District owns and operates two (2) water treatment plants, the Little Cottonwood Water Treatment Plant (LCWTP) and the Point of the Mountain Water Treatment Plant (POMWTP), (collectively called the Treatment Plants). The Treatment Plants have full conventional treatment. Liquid polyaluminum chloride is the primary coagulant at the POMWTP. The estimated annual wet weight of liquid polyaluminum chloride used at POMWTP is 260,000 pounds (lbs.). Actual quantities will vary. Forces of nature, raw water quality, and other factors will determine the amount of polyaluminum chloride required. For a more complete description of product and/or service requirements refer to Exhibit A of the attached sample Agreement. Because of the volatility in pricing for raw materials and other factors, contracts will be limited to a one-year term. Prices are to remain fixed for such term.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
111
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.