Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 27, 2026 at 8:00 PM
Updated May 28, 2026
Site work for a bridge / tunnel in Mount Vernon, Washington. Conceptual plans call for site work for a bridge / tunnel.
The existing paint on the steel surfaces is weathered and damaged, allowing corrosion to occur. Cleaning and painting the steel surfaces will preserve the bridge and maintain the safety of the highway. Length : 0.120 Agency: WSDOT - NW Begin Termini : SR 536 MP 4.72 End Termini : SR 536 MP 4.84 As of May 27, 2026, the project is in Conceptual status. Anticipated letting Year is 2027. WADOT - SR 536/Skagit River Bridge - Painting *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$15,254,562.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 5, 2027
WA-536, Mount Vernon, WA
Related To This Project
Mount Vernon, WA
--
Mount Vernon, WA
--
Mount Vernon, WA
--
Mount Vernon, WA
--
Mount Vernon, WA
Bid Date: Aug 23 2024
Mount Vernon, WA
Bid Date: Aug 28 2024
Mount Vernon, WA
Bid Date: Aug 12 2024
Mount Vernon, WA
Bid Date: Aug 12 2024
Mount Vernon, WA
Bid Date: Aug 29 2024
Mount Vernon, WA
Bid Date: Jul 30 2024
Mount Vernon, WA
--
Mount Vernon, WA
Bid Date: Jul 19 2024
Mount Vernon, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
