Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Renovation of a transportation facility in Barnstable, Massachusetts. Working plans call for the renovation of a transportation facility.
Estimated Cost $1,400,000.00 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Painting, HVAC, Mechanical Systems, Electrical and Waterproofing . Filed Sub Bid Questions must be submitted through the Public Question and Answer Section of the Procurement portal by May 05, 2025, no later than 12:00 PM. The Project includes work related to civil, structural, mechanical, electrical, plumbing, fire protection, and architectural elements. The project scope can be summarized as follows: The project includes the demolition and total replacement of the mechanical / HVAC systems and select services for the existing Airport Traffic Control Tower (ATCT). This stand-alone structure comprises approximately 4,800 square feet over six (6) stories. Building functional programs supported include common horizontal and vertical circulation, personnel break and office space, restrooms, data/communications, electrical and elevator control rooms to support the ATCT "Cab" at the top of the structure. A Variable Refrigerant Flow (VRF) system will serve as the primary HVAC replacement system. The ATCT's electrical rooms, data/communications rooms, and elevator control room will be served by VRF units for primary conditioning, and with parallel dedicated ductless split AC systems on at least three (3) floors, including redundancy and standby. Condensers and support components will be supported by the existing exterior mechanical equipment slab. Questions regarding scope of work or of a technical nature must be submitted through the Vendor Discussion section of the procurement portal by the noon on the date posted above. All Filed sub-bid questions regarding scope of work or of a technical nature must be presented in writing to Amber E. Patterson, Chief Procurement Officer by MAY 05, 2025 no later than 12:00 PM, via email at amber.patterson@town.barnstable.ma.us
Final Planning
Transportation Terminals
$1,400,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
July 14, 2025
480 Barnstable Rd, Barnstable, MA
Related To This Project
Barnstable, MA
Bid Date: Jun 04 2025
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 21 2024
Barnstable, MA
Bid Date: Aug 22 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: Sep 11 2024
Barnstable, MA
Bid Date: Sep 12 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 26 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 08 2024
Barnstable, MA
Bid Date: Aug 15 2024
Barnstable, MA
Bid Date: Aug 22 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
