BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Renovation of a transportation facility in Barnstable, Massachusetts. Working plans call for the renovation of a transportation facility.

Estimated Cost $1,400,000.00 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Painting, HVAC, Mechanical Systems, Electrical and Waterproofing . Filed Sub Bid Questions must be submitted through the Public Question and Answer Section of the Procurement portal by May 05, 2025, no later than 12:00 PM. The Project includes work related to civil, structural, mechanical, electrical, plumbing, fire protection, and architectural elements. The project scope can be summarized as follows: The project includes the demolition and total replacement of the mechanical / HVAC systems and select services for the existing Airport Traffic Control Tower (ATCT). This stand-alone structure comprises approximately 4,800 square feet over six (6) stories. Building functional programs supported include common horizontal and vertical circulation, personnel break and office space, restrooms, data/communications, electrical and elevator control rooms to support the ATCT "Cab" at the top of the structure. A Variable Refrigerant Flow (VRF) system will serve as the primary HVAC replacement system. The ATCT's electrical rooms, data/communications rooms, and elevator control room will be served by VRF units for primary conditioning, and with parallel dedicated ductless split AC systems on at least three (3) floors, including redundancy and standby. Condensers and support components will be supported by the existing exterior mechanical equipment slab. Questions regarding scope of work or of a technical nature must be submitted through the Vendor Discussion section of the procurement portal by the noon on the date posted above. All Filed sub-bid questions regarding scope of work or of a technical nature must be presented in writing to Amber E. Patterson, Chief Procurement Officer by MAY 05, 2025 no later than 12:00 PM, via email at amber.patterson@town.barnstable.ma.us

Final Planning

Transportation Terminals

$1,400,000.00

Public - County

Renovation

55

23

21

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
187
Bidding Soon
2,634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

July 14, 2025

Project location map

480 Barnstable Rd, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.