Renovation of a transportation facility in Barnstable, Massachusetts. Working plans call for the renovation of a 4,800-square-foot, six-story above grade transportation facility.

Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following 1. Field painting of exposed interior items and surfaces. 2. Field painting of exposed exterior items and surfaces. 3. Surface preparation for painting. The project consists of eight phases within a single contract. The Project includes work related to structural, mechanical, electrical, plumbing, fire alarm and architectural elements. The project includes the demolition and total replacement of the mechanical / HVAC systems and select services for the existing Airport Traffic Control Tower (ATCT). This stand-alone structure comprises approximately 4,800 square feet over six (6) stories. Functions include common horizontal and vertical circulation, personnel break and office space, restrooms, data/communications, electrical and elevator control rooms to support the ATCT Cab at the top of the structure. A water-sourced heat pump (WSHP) will serve as the primary HVAC replacement system. The ATCTs electrical room data / communications rooms, and elevator control room will be served by WSHP units for primary conditioning, and with parallel dedicated ductless split AC systems on at least three (3) floors and the Tower Cab for redundancy. The phases of work are as follows - subject to refinement upon selection of the General Contractor: Phase 1 is the installation of the temporary Contractor Staging Area Phase 2 - 7 includes the demolition of the existing air handling system within the existing exterior equipment pad and the demolition of existing ducting and associated ceiling elements within the existing Airport Traffic Control Tower (ATCT) facilities. Other phases include the floor-by-floor installation of replacement HVAC components within the existing ATCT. Phase 8 is the final phase of work consisting of the removal of temporary construction fencing and restoration of the existing conditions on the landside areas. Last Day to Submit General Contractor Bid Questions: MAY 21, 2025 BY 12:00 PM 3.7 % DBE FY25 Airport Traffic Control Tower HVAC Replacement. Estimated Cost $1,400,000.00Contractor Qualification DCAMM Certificate

Final Planning

Transportation Terminals

$1,400,000.00

Public - City

Renovation

55

20

7

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
187
Bidding Soon
2,634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

September 15, 2025

Project location map

480 Barnstable Rd, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.