Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Renovation of a transportation facility in Barnstable, Massachusetts. Working plans call for the renovation of a 4,800-square-foot, six-story above grade transportation facility.
Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following 1. Field painting of exposed interior items and surfaces. 2. Field painting of exposed exterior items and surfaces. 3. Surface preparation for painting. The project consists of eight phases within a single contract. The Project includes work related to structural, mechanical, electrical, plumbing, fire alarm and architectural elements. The project includes the demolition and total replacement of the mechanical / HVAC systems and select services for the existing Airport Traffic Control Tower (ATCT). This stand-alone structure comprises approximately 4,800 square feet over six (6) stories. Functions include common horizontal and vertical circulation, personnel break and office space, restrooms, data/communications, electrical and elevator control rooms to support the ATCT Cab at the top of the structure. A water-sourced heat pump (WSHP) will serve as the primary HVAC replacement system. The ATCTs electrical room data / communications rooms, and elevator control room will be served by WSHP units for primary conditioning, and with parallel dedicated ductless split AC systems on at least three (3) floors and the Tower Cab for redundancy. The phases of work are as follows - subject to refinement upon selection of the General Contractor: Phase 1 is the installation of the temporary Contractor Staging Area Phase 2 - 7 includes the demolition of the existing air handling system within the existing exterior equipment pad and the demolition of existing ducting and associated ceiling elements within the existing Airport Traffic Control Tower (ATCT) facilities. Other phases include the floor-by-floor installation of replacement HVAC components within the existing ATCT. Phase 8 is the final phase of work consisting of the removal of temporary construction fencing and restoration of the existing conditions on the landside areas. Last Day to Submit General Contractor Bid Questions: MAY 21, 2025 BY 12:00 PM 3.7 % DBE FY25 Airport Traffic Control Tower HVAC Replacement. Estimated Cost $1,400,000.00Contractor Qualification DCAMM Certificate
Final Planning
Transportation Terminals
$1,400,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
September 15, 2025
480 Barnstable Rd, Barnstable, MA
Related To This Project
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 21 2024
Barnstable, MA
Bid Date: Aug 22 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: Sep 11 2024
Barnstable, MA
Bid Date: Sep 12 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: May 14 2025
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 26 2024
Barnstable, MA
--
Barnstable, MA
Bid Date: Aug 08 2024
Barnstable, MA
Bid Date: Aug 15 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
