BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a mixed-use development in Kelso, Washington. Design plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

As of February 26, 2025, this project is in the design phase. Construction should begin in late 2025 or early 2026. *Previous solicitation listed below for reference:* Work to be performed by the selected Consultant will consist of preparing preliminary engineering design for two (2) federally funded projects in Castle Rock, Washington. The City of Castle Rock requests one (1) Statement of Qualifications from Consultants that outlines qualifications that apply to all project sites. The selected Consultant will be expected to enter into a Local Agency A&E Professional Services (Cost Plus Fixed Fee) Consultant Agreement. The Scope of Services to be provided includes separate site specific packages with the intent to advertise the projects together, but tracked individually. Scope of Work A) Improvements to the Six Rivers Regional Trail System (SRRTS) Phase 2 corridor through Castle Rock, Washington along Huntington Avenue near Lion s Pride Park. Proposed improvements include design of: 1) Provide pedestrian pathway lights along the City s Riverfront Trail (an identified section of the SRRTS); 2) Install asphalt path to connect Lion s Pride Park to Huntington Avenue on the west side of the street; and 3) a pedestrian crossing (which could include a traffic island) near the intersection of Huntington Avenue and Larsen Lane SW. B) City Wide Pedestrian Improvements Project in Castle Rock, Washington which will provide the following improvements: 1) Install mounted barrier lights along with wiring and conduit from an existing power source on SR 411 Bridge (PH-10) across the Cowlitz River to the west side. 2) Updating school zone lights and adding speed read out display equipment. 3) Construction of bulb-outs at key intersections where pedestrian activity is high and visibility of pedestrians is needed. 4) Installing pedestrian crossing improvements at the intersection of A Street SW (SR 411) and Huntington Avenue South. 5) Construction of a sidewalk section to fill a missing gap from A Street SW to Cowlitz Street along Huntington Avenue South (SR 411). These projects are funded by the Washington State Department of Transportation (WSDOT) utilizing federal pass through funds from the Federal Highway Administration (FHWA). Professional and technical requirements for these projects will require surveying, civil, structural and electrical engineering. A topographic survey of the project corridors will be required to be performed by the consultant. Submittals will not be accepted after that time and date. Any questions regarding this project should be directed to Public Works Director, David Vorse at 360-274-7478. The following schedule has been established for the submission and evaluation of the SOQs and selection of the Consultant. These are tentative dates only and the City reserves the right to adjust these dates at its sole discretion: The method of Contractor Selection has not been Determined at this time.

Design

Sidewalks / Parking Lot

$1,004,800.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
91
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.