BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Yerington, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question Deadline 08/05/2024 at 4:00 PM PT Type: District-2 Contract Cost Range: R23 ($3,200,000.01 to $3,850,000) Funding Type: State Opening Office: Carson City Project No(s): SPSR-0339-(340) County(s): Lyon Enterprise Goal: 0 % Location: SR 339 Work Description: mill and fill Project Manager: Ambere Angel Designer: Gregory Mindrum Resident Engineer: Lawrence, Andy Milepost(S): Mp Ly 0.000 to Mp Ly 6.800 Contract Days: 45 (Working) Liquidated Damages: $4,800.00 All proposals must be accompanied by a proposal guaranty (bid bond or other guaranty) made unconditionally payable to the Nevada Department of Transportation in the amount equal to 5% of total bid amount. The guaranty may be cash, cashiers check, certified check, money order, bank draft, an undertaking executed by a corporate surety company authorized to do business in the State of Nevada, an electronic bid bond validated with Surety 2000 or Sure Path, or any other guaranty that may be especially approved by the Department. NVDOT - Mill and Fill *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,430,000.00

Public - State/Provincial

Paving, Site Work

8

9

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
168
All Active Projects
66
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 14, 2024

img_map_placeholder

NV-339, Yerington, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.