BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Site work and paving for a mixed-use development in Eureka, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; road / highway; and road / highway.

Assistance During Bidding for Questions, Addenda, Review of Bids and Dbe Goals if Required, Along With Recommendation for Award. Other Pavement Preservation Project Design Work as Appropriate. Evaluation Criteria Submittals Will Be Evaluated and Ranked Based on the Following Criteria: 1) Qualification of Proposed Project Manager 2) Qualifications/expertise of Firm 3) Ability to Meet Schedule 4) Approach to Project 5) Familiarity With Wsdot/fhwa Standards 6) Past Performance/references 7) Approach to Meet the Dbe Goal or Sbe Goal (Dbe Participation Plan or Sbe Plan) Submittal Submittals Should Include the Following Information: Firm Name, Phone and Fax Numbers; Name of Principal-in-charge and Project Manager; and Number of Employees in Each Firm Proposed to Project. Beyond the Work Already Noted, the Consultant Will Be Relied Upon for the Following: Submittal and Completion of Cultural/environmental Documentation Per the Federal Nepa Process. Right of Way Acquisition as Required. Collaborate With City to Create and Implement a Communications Plan for Public Interaction Both in Advance (Virtual Open House) and During Construction. Evaluate and Document Pruning and Trimming Requirements for Vegetation. Design of Ada Improvements as Required. Design of Rapid Rectangular Flashing Beacon's (Rrfbs) at High Traffic Locations. Evaluate and Design of Signage, Striping, and Illumination. Plans and Estimate at 30% Design, With Full Ps&e Including Bid Package at 60%, 90% and 100% Bid Ready Submittal. Construction Contract Submittal Register and Proposed Bid Schedule. Proposed Construction Schedule. Alder-tausick-airport Pavement Preservation Project to Obligate Construction Funding No Later Than August 31st, 2026. This Agreement Will Be Approximately 15 Months in Duration With the Option for the City of Walla Walla to Extend It for Additional Time and Money if Necessary.

Conceptual

Roads / Highways

$3,125,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
30
Bidding Soon
299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.