BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Visalia, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done consists, in general, of road overlays, pavement grinds, pulverized base, and pavement improvements. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. Bidders may visit the project site. The Project is to be completed within sixty (60) working days from the date to be established in the NOTICE TO PROCEED. The Contract includes provisions for Liquidated Damages if the Project is not timely completed. Technical questions should be directed in writing to Claudia Sanchez at the Resource Management Agency, 5961 S. Mooney Blvd, Visalia CA 93277 or at CSanchez5@tularecounty.ca.gov . No questions will be accepted within five (5) working days of the bid opening (Questions must be received by 5:00 pm on Thursday August 8, 2024). All questions and responses will be continuously posted on the County website. Bids are required for the entire work described herein. Submit the bidder's security in the form of cash, a bidder's bond, or a certified check or cashier's check, in the amount of ten percent (10%) of the amount bid or the bid will be considered nonresponsive. The successful bidder must provide the performance bond, payment bond, workers compensation certificate, and liability insurance policy required by the Special Provisions and contract. Three million dollars ($3,000,000) liability coverage is required for this project. The Board of Supervisors reserves the right to reject any or all bids, and/or waive any informality in any bid, and/or determine in its discretion the responsibility of any bidder. Pre bid meeting description: Bidders are advised that, unless otherwise stated, the contract price will be full compensation for all required work and no additional compensation will be allowed. If the bidder must obtain permits, licenses, contracts or other services to prosecute the work, the bidder will pay the cost of those items and no other compensation will be paid by the County.

Award

Roads / Highways

$8,508,373.00

Public - City

Paving, Site Work

38

10

6

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
401
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 21, 2024

img_map_placeholder

Multiple Locations, Visalia, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.