Site work and renovation of a civil project in Middlebury, Indiana. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

in accordance with IC 36-1-12-4 and IC 5-3-1-2, that the Town of Middlebury, located in Elkhart County, Indiana, hereinafter referred to as the "Owner", will receive sealed proposals for the construction of the following: Contract A - Water Tower Improvements Contract B - Water Treatment Plant Improvements Contract C - Water Distribution Improvements Any contract awarded under this Advertisement for Bids is expected to be funded by the Indiana Finance Authority (IFA) State Revolving Fund (SRF). Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract. In general, the Projects include the following work items: Contract A - Water Tower Improvements oReplacement of Water Tower No. 1 oInstallation of new control valves oStandby Electrical Generator at Booster Station Contract B - Water Treatment Plant Improvements oImprovements to the existing Detention Tank oImprovements to the existing Clearwell Tank oConstruction of a new Detention Tank and an Induced Draft Aerator oConstruction of a new Clearwell Tank oChlorine System Improvements o SCADA System Improvements oElectrical and Control System Improvements oPlant Security and Lighting Improvements Contract C - Water Distribution Improvements oHighland Hills Pressure Regulating Valve and Structure Replacement Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is Jones Petrie Rafinski Corp., 325 S. Lafayette Boulevard, South Bend, IN 46601. The Issuing Office's representative and primary contact is Joshua Wyman, who can be reached at (574) 232-4388 or via email at jwyman@jpr1source.com. If Bidders fail to register and do not receive updated information, their bids shall be deemed unresponsive if any required items are not included. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Owner reserves the right to reject any proposal for being unresponsive or deemed irresponsible, reject all proposals, or to accept the lowest responsive and responsible proposal/Bidder. Any proposal may be withdrawn prior to the above scheduled time for the opening of proposals or authorized postponement thereof. Any proposal received after the time and date specified may be rejected. No proposal may be withdrawn after the scheduled closing time for receipt of Bids for at least one hundred fifty (150) days while final project approvals are acquired from the IFA SRF. Wage Rates Wage rates on the project shall not be less than the Federal Davis-Bacon wage scale published by the U.S. Department of Labor. Question Deadline 08/12/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Renovation, Site Work

27

32

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Procedures, Closeout Submittals, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roof and Wall Specialties and Accessories, Roof Accessories, Ridge Vents, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Coiling Doors and Grilles, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
56
Bidding Soon
707
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

September 18, 2024

img_map_placeholder

Multiple Locations, Middlebury, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.