BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Pinehurst, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

County: Shoshone Est. Value Notes: $500,000 to $1,000,000 Bridge (Replacement or Rehabilitation) For the work of repairing the existing bridge and adjoining approaches Please use the project's Q&A feature for any design-related questions IDOT: Call 1 - West Fork Pine Creek Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For any design related questions, please submit For hard copy bids a bidder may revise a proposal after it has been deposited with the State, provided the request for such revision is received by the State by fax transmittal before the time set for the Bid Opening. Faxed or Emailed revisions must be received at (208) 332-2090/itdplanroom@itd.idaho.gov. The faxed or emailed revision to the bid schedule must be on this form or on Company letterhead following the same format, providing the same information and signed by a representative of the bidder, authorized to sign contract documents. ALL faxed in or emailed documents received prior to bid opening will supersede the documents provided in the hard copy proposal package. BID BONDS WITH SIMILIAR CONDITIONS TO THE 5% GUARANTEE MAY ALSO NOT BE ACCEPTABLE. Question Deadline 08/07/2025 at 5:00 PM PT Prior to bid opening, submit any project-related question onlline Submit questions on the Thursday prior to the bid opening. ITD is not obligated to respond to questions received after the stated cutoff date and time In an effort to achieve ITD's DBE Annual Participation Goal (APG) of 10.11% utilization, ITD requires responder to utilize certified subcontractors and suppliers listed on its DBE Directory located at: https://itd.dbesystem.com/. For this project, it has been determined that there is a DBE availability of 18% or more. For more information regarding ITD's DBE Program please go to https://itd.idaho.gov/civilrights/

Award

Bridges / Tunnels

$808,050.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

45

13

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
19
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

October 6, 2025

Project location map

Pine Creek Rd, Pinehurst, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.