BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Coldspring, Texas. Completed plans call for the renovation of a detention facility.

Award: Dillon Construction Inc for $428,490.07 San Jacinto County Jail Repairs Scope of work Phase One , Two and Three Furnish and install complete weathertight roof using TS-324 Solar White Standing Seam roof including all required sealants, long life fasteners, flashings, closures etc. Remove all of the Gutters and downspouts from the building Remove Parapet Cap, back up panels and transition flashing from back side of parapet North end wall 3 Remove all of the PBR roof Panels in phase one and three and all of the Standing seam roof panels phase Two 4 Remove 4 Roof Curbs (equipment removed by owner) 5 Remove all vent flashings for PVC Pipes (combine as many vent pipes as possible by owner) 6 Remove all Metal flashings for Flues (flue pipe removed by owner) Delete all un used metal flues / vents 7 Owner will remove and re-install Satellite Dish and Two Antennas from roof 8 Owner will be responsible for all Data, security, communications Etc. equipment 9 Furnish and Install 2 x 4 x 12 Ga. Red Oxide angle to Web of Purlins where top flange is rusted out from water leaks. This should be a allowance of 200' linear feet of 2 x 4 angle cut up into approx. 24 lengths (20 past each side of Ji1 / r rusted area. #12x1 1/4 SDS long life install 1 from each end and max 12 on center in length of angle j 10 Furnish and install new low eave plate for new standing seam roof 11 Furnish and install 1 x 24 Ga strapping to roof purlins top and bottom of purlins 2 runs every 60 fasten with 1 x #14 pan head screws at each purlin 12 Furnish and install new 26 Ga. Colored eave trim 4 on top of new eave plate (item #9 above) down over existing eave strut past top of existing block and brick wall at least 2 and add 1/2 drip lip to bottom of trim see detail Page #4 13 Furnish and install R-19 White vinyl re-enforced backed insulation 14 Furnish and install new 24 Ga. TS-324 Solar White standing seam roof panels as manufactured by Schulte Building systems These panels should be one full length from eave to Ridge Approx. 59 long no end laps will be excepted 15 Furnish and install low eave metal Inside closures for TS-324 panels with Butyl sealants, Low fixed clips , metal ridge closures, metal ridge roll, all per Schulte building systems installation Manuel 16 Furnish and install the 4 new roof curbs as manufactured by LMC Specs attached 17 Furnish and install new framing approx. 8 x 8 for TWO new roof curbs 18 Furnish and install two new LMC roof curbs approx.. 8 x 8 with removable caps for mechanical equipment removal as needed Furnish and install new roof transition trim at Parapet wall per Schulte installation Manuel 2u Furnish and install new 26 Ga. PBU Colored Back up panels at Parapet with inside closures at base with 1 Butyl tape sealant on inner face and outer face of closures 21 Furnish and install new 24 Ga. Colored Cap trim on top of parapet wall with 1/2 Drip lip on outside wall with outside closures inside and out side of cap trim with 1 Butyl tape sealants Install both inner face and outer face of closures 22 Furnish and install all new Rubber Decktites to fit existing roof vents and metal roof stacks. All decktites to have Long life fasteners 1 apart at metal base ring with 1 butyl tape on bottom of base ring. Top of rubber decktites to be sealed with required caulking and banded to pipe with typical Hose clamp (clamps are stainless steel ) 23 Furnish and install new Gutters and downspouts (26 - 4 x 3 downspouts 13 each side ) 24 Furnish and install new Purlin extension angle to support Roof panels at south end wall over block wall 25 Furnish and install oversize 3 x 8 rake angle on south end wall to attach new rake trim 26 Furnish and install new rake trim South end wall see page #5 1 Phase Three @ Rec Room only Furnish and install new support structure as required under existing valley area at Rec Room Cricket 2 Furnish and install new oversize valley pan with divertor in center of valley pan 3 Cut and install new Standing seam roof as required and install metal closures in highs with 1 Butyl tap top and bottom of closures and double roll of butyl tap under entire length of valley pan two runs on each side of valley 4 Furnish and install roof conversion trim on three sides of rec room from roof to block wall 5 Saw cut masonry wall 1/4 wide x 1 deep to install Counter flash and install NPI sealants in saw cut before and after installing the new counter flash 6 Furnish and install new 26 Ga. Colored eave trim 4 on top of new eave plate (item #9 above) down over existing eave strut past top of existing block and brick wall at least 2 and add 1/2 drip lip to bottom of trim see detail attached below 7 Furnish and install new Gutters and downspouts (4 - 4 x 3 downspouts 2 each side )

Award

Jails / Prisons

$428,490.00

Public - County

Renovation

3

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
202
Bidding Soon
4,138
All Active Projects
1,701
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 7, 2024

September 6, 2024

img_map_placeholder

200 Slade St, Coldspring, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.