BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Site work for an educational facility in Atlanta, Georgia. Completed plans call for site work for a educational facility.

**As of January 10, 2025 project was awarded to Leapley Construction but awarded amount is not available.** Project Description The scope of work for this project includes, but is not limited to, providing and installation of new GSU branding exterior signage at the GSU Robinson College of Business Buckhead Center, located at 3348 Peachtree Road NE, Atlanta GA, 30326 with a GSU ‘Flame’ and ‘Georgia State University’ on the northeast side ‘Robinson’ on the Northwest side of the building parapet. The work must be performed by a General Contractor with experience working on projects of similar scope and complexity. The scope of work includes the removal of the existing curtain wall glazing, approximately 190 ft. elevation, storing glazing in owner’s penthouse mechanical room, fabrication and installation of structural supports and outrigging to support the sign, flashing and waterproofing of the exposed curtain wall, installation of new curtain wall panels and electrical feeds and submeter for signage illumination, providing the signage and installing the sign, obtaining permit(s) by City of Atlanta (as a pass thru expense and not to be included in the bid) and protection. The approved dimensions of the sign are approximately 122’ L by 4’ H. to be mounted approximately 190’ above a private drive. Project Delivery Method The delivery method for this Project will be design-bid-build and, as a minimum, will employ the services of a Design Professional, and a General Contractor. Construction Cost The Stated Cost Limitation (SCL) for this project is $ 800,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability, bid amount or other circumstances. Project Schedule The firm Associated Space Design, dba skydesign has developed the construction design documents for the project, which are complete and available for distribution to eligible firms by December 05, 2024. It is anticipated that construction will begin February, 2025 and be completed by May 2025. (All of the dates above are estimates which are subject to change.) Deadline for submission of written questions and requests for clarification (11/04/2024 2:00 PM) Deadline to submit Competitive Sealed Bids (tentative) 01/14/2025 2:00 PM Deadline for questions 12/19/2024 10:00 AM Deadline to provide responses to the questions 1/07/2025 2:00 PM Owner conducts Pre-Bid Site Visit for finalists (tentative) 12/12/2024 10:00 AM

Award

Educational

$800,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
110
Bidding Soon
2,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

February 3, 2025

Project location map

3348 Peachtree Rd NE, Atlanta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.