Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2024 at 8:00 PM

Updated July 15, 2026

Site work and paving for a sidewalk / parking lot in Monroeville, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work will be performed in Plum Borough, Allegheny County, PA. The work at the Boyce Park Water Storage Tank site essentially includes removal of existing bituminous pavement, excavation, grading, compaction of subgrade, placement of subbase, placement of bituminous pavement materials, all required restoration and all other related appurtenances. Anticipated Contract Award Date: August 19, 2024 Proposed Start Date: September 1, 2024 Estimated Completion Date: December 1, 2024

Award

Sidewalks / Parking Lot

$94,837.00

Public - City

Paving, Site Work

5

10

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
151
Bidding Soon
2,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 1, 2024

Project location map

To Be Determined, Monroeville, PA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed