BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Waynesboro, Mississippi. Completed plans call for site work for a playground / park / athletic field.

Furnishing The City's Requirements For The Following: Waynesboro Sportsplex Field Improvements The Project Is For Four New Baseball Fields. Excavation And A Portion Of The Drainage Has Been Completed By The Owners, And The Scope Of Work Is To Complete The Construction Of The Fields. Project Generally Includes Laser Grading, Drainage, Irrigation, Installing Top Soil, Finish Grading, Grassing And Turf. The Approximate Site If 4.7 Acres Of Ball Field Construction. Special Qualifications Are Required For Portions Of The Project. The City Will Furnish The Limestone, Sand And Top Soil. Construction Time Line Is 160 Calendar Days. Each Bid Must Be Received -Sealed And Marked - Exactly As Follows: Bid: Waynesboro Sportsplex Field Improvements Waynesboro, Mississippi No Bid May Be Withdrawn For A Period Of Sixty (60) Days. The Lowest And Best Proposal Received Will Be Accepted, Subject To The Provisions Of Section 31-7-13 Of The Mississippi Code Of 1972, Annotated And Amended, And Other Applicable State Law; But The Board Reserves The Right To Reject Any Or All Proposals Received And To Waive Informalities.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
13
Bidding Soon
238
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

September 19, 2024

img_map_placeholder

To Be Determined, Waynesboro, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.