Published January 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Bridgewater, New Jersey. Completed plans call for site work for a water / sewer project.

As of November 26, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Storm Control Pumping Station Flood Mitigation Project All questions that Bidders may have regarding the Bid Documents shall be submitted in writing to the Engineer, Morehouse Engineering, PO Box 205, 43 Railroad Place, Hopewell, NJ 08525 or email Sky@moreimineering.com, phone 609-466-4955, no later than 2:00 p.m., August 20, 2024. The projected duration of the project is: PHASE 1: 15 months (455 calendar days) from award. The Contractor will be allowed to start Phase 2 prior to the end of Phase 1 if the Authority receives the FEMA BRIC grant authorization. PHASE la: EXTENSION (If Applicable) Contractor shall receive $5,000 per month of extended home office overhead for up to 12 months if the FEMA BRIC grant authorization is not received. PHASE 2: 21 months (635 calendar days) from the end of PHASE 1.

Award

Water / Sewer

$5,669,890.00

Public - County

Site Work

30

24

29

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Printers, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Special Instrumentation, Stress Instrumentation, Meteorological Instrumentation
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment, Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Structured Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, High-Voltage Switchgear and Protection Devices, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Manufacturing Equipment, Assembly and Testing Equipment, Applicators, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
282
Bidding Soon
5,004
All Active Projects
2,348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

January 8, 2025

img_map_placeholder

Multiple Locations, Bridgewater, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Storm Control Pumping Station Flood Mitigation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.