BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a warehouse / distribution facility in Minot, North Dakota. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

As of October 16, 2024 project was awarded to Greystone Construction, but awarded amount is not available. Salt Storage Building All bidders required to provide bid bond in the amount of 5% of bid (or certified check) Contractor to provide performance and payment bonds in the amount of 100% of contract amount The City Council reserves, to itself, the right to reject any or all bids and to award the contract as it deems necessary and in the best interest of the City of Minot Overview: 65 feet wide x 80 feet long, 3-sided singular open-ended building (back upper level window type opening acceptable) to store road salt. Building to be erected on contractor-supplied concrete drilled pier foundations extending 2 above grade Interior bunker wall systems to be constructed using 8 tall precast bunker panels along back wall and both sidewalls Alternate pricing to include center divider Building required to have a minimum interior vertical clearance of 29-4 tall (including foundation) from finished floor to center as shown in the drawing. Contractor must provide engineered, stamped drawings for buildings and foundations by a licensed engineer in the state of where the project is located. Work must be completed in 120 days after notice to proceed. City of Minot reserves the right to award contract to lowest, most responsible bidder.

Award

Warehouse / Distribution

$261,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
40
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 19, 2024

img_map_placeholder

To Be Determined, Minot, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.