BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

In accordance with recommendations in the City's Water Master Plan and Sewer Master Plan, the scope of this project includes the installation of approximately 1,300 linear feet (LF) of a subaqueous 12-inch inside diameter (ID) High-Density Polyethylene (HDPE) force main via Horizontal Directional Drilling (HDD) and the installation of approximately 725 LF of a subaqueous 10-inch HDPE water main via Horizontal Directional Drilling (HDD). These new portions of force main and water main will relocate and replace the existing subaqueous crossings. The project also includes the installation of approximately 2,360 LF of 10-inch Polyethylene Chloride (PVC) C-900 force main that will be installed via an open trench in order to connect the proposed force main to the existing system at the North and South ends of the project. In addition, approximately 100 LF of 8-inch Ductile lron (Dl) water main will be installed via an open trench, in order to connect the proposed water main to the existing system at the north and south ends of the project. The work set forth within these contract documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Question Deadline 08/30/2024 at 5:00 PM ET Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov. Project Site: Sunset Islands 2 and 3 (Approximately from 2288 SUNSET DR, along Sunset Drive, along Lake Avenue, along W 27th Street, along W 23rd Street to 2700 SUNSET DR) 1. Failure to achieve Substantial Completion: $4,722.22/day 2. Failure to achieve Final Completion: $4,722.22/day Days for Substantial Completion: 180 days Days for Final Completion: 40 days Total Project Duration: 220 days

Bid Results

Water / Sewer

$3,360,013.00

Public - City

Site Work

64

6

2

7

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
64
Bidding Soon
1,105
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

November 21, 2024

img_map_placeholder

Multiple Locations, Miami Beach, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.