Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 31, 2024 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.
In accordance with recommendations in the City's Water Master Plan and Sewer Master Plan, the scope of this project includes the installation of approximately 1,300 linear feet (LF) of a subaqueous 12-inch inside diameter (ID) High-Density Polyethylene (HDPE) force main via Horizontal Directional Drilling (HDD) and the installation of approximately 725 LF of a subaqueous 10-inch HDPE water main via Horizontal Directional Drilling (HDD). These new portions of force main and water main will relocate and replace the existing subaqueous crossings. The project also includes the installation of approximately 2,360 LF of 10-inch Polyethylene Chloride (PVC) C-900 force main that will be installed via an open trench in order to connect the proposed force main to the existing system at the North and South ends of the project. In addition, approximately 100 LF of 8-inch Ductile lron (Dl) water main will be installed via an open trench, in order to connect the proposed water main to the existing system at the north and south ends of the project. The work set forth within these contract documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Question Deadline 08/30/2024 at 5:00 PM ET Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov. Project Site: Sunset Islands 2 and 3 (Approximately from 2288 SUNSET DR, along Sunset Drive, along Lake Avenue, along W 27th Street, along W 23rd Street to 2700 SUNSET DR) 1. Failure to achieve Substantial Completion: $4,722.22/day 2. Failure to achieve Final Completion: $4,722.22/day Days for Substantial Completion: 180 days Days for Final Completion: 40 days Total Project Duration: 220 days
Bid Results
Water / Sewer
$3,360,013.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2024
November 21, 2024
Multiple Locations, Miami Beach, FL
Related To This Project
Miami Beach, FL
Bid Date: Aug 09 2024
Miami Beach, FL
Bid Date: Aug 09 2024
Miami Beach, FL
Bid Date: Aug 09 2024
Miami Beach, FL
Bid Date: Aug 26 2024
Miami Beach, FL
Bid Date: Dec 13 2024
Miami Beach, FL
Bid Date: Oct 18 2024
Miami Beach, FL
Bid Date: Oct 23 2024
Miami Beach, FL
Bid Date: Oct 11 2024
Miami Beach, FL
Bid Date: Aug 13 2024
Miami Beach, FL
Bid Date: Aug 16 2024
Miami Beach, FL
Bid Date: Sep 12 2024
Miami Beach, FL
Bid Date: Jul 23 2024
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed