Published October 5, 2024 at 8:00 PM
Updated October 6, 2024
Site work for a road / highway in Deer Lodge, Montana. Completed plans call for site work for a road / highway.
Sager Lane Irrigation Infrastructure Improvement Project Contract No. 700185 For assistance with functionality, such as vendor registration, responding to events, contact the Help Desk, 406-444-2575, emacs@mt.gov. Question Deadline 08/09/2024 at 5:00 PM MT The Project is at the Sager Lane diversion site located adjacent to Sager Lane, Dempsey Creek, and the Clark Fork River, Powell County, Montana, Section 33, Township 7 North, Range 9 West PROJECT DESCRIPTION AND BACKGROUND The Montana Natural Resource Damage Program (NRDP) in cooperation with the Clark Fork Coalition and Montana Trout Unlimited is working to improve the existing irrigation infrastructure at the Sager Lane Diversion Site. The irrigation infrastructure improvements includes removal of existing infrastructure and installation of a new; drum/cylinder screen(s), pump vault, three vertical turbine pumps, pipe manifold, pipeline and , control systems, Contractor is required to connect the system to power supply (including permitting) and earthwork necessary for the irrigation infrastructure improvement. A separate contract is being let by the Natural Resource Damage Program for diversion, bypass, contamination removal, and backfill stockpile construction at the project site. The contractor under that separate contract will complete their work prior to the irrigation infrastructure work commencement.
Bid Results
Roads / Highways
$291,323.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2024
September 26, 2024
Sager Ln, Deer Lodge, MT
Related To This Project
Deer Lodge, MT
Bid Date: Aug 27 2024
Deer Lodge, MT
Bid Date: Dec 19 2024
Deer Lodge, MT
Bid Date: Feb 06 2025
Deer Lodge, MT
--
Deer Lodge, MT
Bid Date: Mar 27 2025
Deer Lodge, MT
Bid Date: Apr 10 2024
Deer Lodge, MT
Bid Date: Apr 02 2024
Deer Lodge, MT
Bid Date: Oct 31 2023
Deer Lodge, MT
Bid Date: Feb 16 2022
Deer Lodge, MT
Bid Date: Feb 21 2022
Deer Lodge, MT
Bid Date: Mar 09 2022
Deer Lodge, MT
Bid Date: Mar 15 2022
Deer Lodge, MT
Bid Date: Mar 01 2022
Deer Lodge, MT
Bid Date: Jan 27 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.