BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Mississauga, Ontario. Completed plans call for the renovation of a playground / park / athletic field.

The City is seeking detailed bids from construction firms to provide complete construction management services for Fire Alarm and Fire Protection System Renewal (Scope A) and Emergency Generator Replacement and Upgrades (Scope B), located at City Hall, 300 City Centre Drive, Mississauga ON, L5B 3C1. The successful bidder will be part of two (2) separate teams formed by the City and consultants for the implementation of the project. One team will be for Scope A, and a separate team will be for Scope B. The City requires that the construction administration of Scope A and Scope B are separate and distinct. This includes, and is not limited to: Design meetings; Construction meetings; Written correspondence; Communications (shop drawings/RFI/PCO/CO/CD); Quotations; Project schedules; Schedule of values; Progress billing applications; Deficiency lists; Training and Close-out procedures. The Construction Manager's Fee will be a fixed fee as determined by the City and shown in the Schedule of Prices for all phases and is excluded from the Construction Budget. The Construction Manager's Fee will be paid in accordance with the City of Mississauga Amendments to CCDC 5B - 2010 Contract. The Construction Manager's Fee and the Construction Budget will be divided between Scope A and Scope B as outlined below. Should the value of the work exceed the total Construction Budget, or should the value of the work for Scope A and/or Scope B exceed the Construction Budget for their respective Scope, the City reserves the right to revise or remove all or any part of the Scope and adjust the Construction Manager's Fee accordingly. Pre-Construction Phase Pre-Construction Phase Commence on September 30, 2024 or sooner, subject to issuance of a purchase order Substantial Completion February 27, 2026 Post-Construction Phase for 1-year warranty period Ending on February 27, 2027 The building requires lifecycle renewal of the existing Fire Alarm system, the existing Fire Protection/Sprinkler System (partial renewal) and their components. Construction Manager's Fee - $120,000.00 Construction Budget - $4,000,000.00. Emergency Generator Replacement and Upgrades: Construction Manager's Fee - $90,000.00 Construction Budget - $3,000,000.00 Documents can be obtained at: https://mississauga.bidsandtenders.ca Question Deadline 08/23/2024 at 12:00 PM ET Bid values are undisclosed

Bid Results

Playgrounds / Parks / Athletic Fields

$7,000,000.00

Public - City

Renovation

33

16

8

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
250
Bidding Soon
4,560
All Active Projects
1,784
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 4, 2024

January 2, 2025

February 27, 2026

img_map_placeholder

300 City Centre Dr, Mississauga, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.