BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Bakersfield, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Purpose of This Project is to Reconstruct the Deteriorating River Canal Backup Weir and Allow for Increased Operational Efficiency. The Project Will Address Issues Related to Preservation of Flood Water Conveyance, Distribution of Water to Canals and Downstream Water Rights Holders, and the Integrity of the Downstream Coffee Road Bridge That Has Created Public Health, Welfare, and Safety Concerns. The Work Consists of, in General, the Replacement of an Existing River Weir. In Order to Accomplish This, the Work Includes, but is Not Limited to, Demolition and Removal of the Existing Weir and Adjacent Retaining Wall, Including the Removal of Specified Existing Sheet Piling, Removal of Existing Concrete Rubble, Construction of a New Reinforced Concrete Weir With Wingwalls and Abutment and Adjacent Retaining Wall, With the Placement of Sheet Piling, Furnishing and Installing an Underdrain System, Radial Gated Bays With Motor Controlled Radial Gates, Weir Board Bays With Miscellaneous Metal Supports, Handrailing and Fencing, Reconstruction of River Channeling in the Riverbed With Excavation, Backfill and Compaction Around and Under Existing Bridge Bent Pile Caps, Placement of Rock Slope Protection on Channel Slopes and River Invert, Earthen Embankments, Construction of a Control Center Instrument Building Including a Scada System and a Motor Control Center, Aggregate Base Surfacing, Asphalt Paving for Connection to the Existing Bike Path, Furnishing and Installing All Electrical; and All Other Incidental Items Necessary, Including Environmental Compliances, for the Complete Construction and Verified Operation of the Kern River Backup Weir. Estimated Bid Value : 4,000,000 to 5,000,000 Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The City will only receive construction bids from general contractors who have been approved to be on the Final Bidders List for this project. General contractors interested in submitting a construction bid for this project must first submit a Responsibility Statement and Questionnaire as described in this document. Firms interested in submitting bids as a subcontractor or material supplier do not need to submit a Responsibility Statement and Questionnaire. A Bidders' Bond is Not Required to Be Submitted With the Responsibility Questionnaire. However, a Bidders' Bond Shall Be Submitted by the Bidders Approved to Be on the Final Bidders List at the Time of Bid Submission. Contractors License: the Contractor Shall Possess a Class "a", and Any Other Required Contractors Licenses at the Time the Contract is Awarded. City Council Awards Agreement for Construction of the Project (anticipated date) October 23, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$5,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
396
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

October 14, 2024

img_map_placeholder

Coffee Rd, Bakersfield, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.