BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2024 at 8:00 PM

Updated December 20, 2024

Site work, paving and outdoor lighting for a mixed-use development in Lakeland, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Polk Road Name: SR 35 Limits: From 9th St Nw to N of Oak Hammock Loop Project(s): 44923215201 (*) Federal Aid No: D123103B Total Roadway Length: 7.506 Miles Total Bridge Length: 0.107 Miles Total Proposal Length: 7.613 Miles Contract Days: 310 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Days Please read the full advertisement Description: The improvements under this Contract consist of resurfacing, restoration, and rehabilitation (RRR), including milling and resurfacing of the existing pavement, new four-foot paved inside shoulder construction, guardrail replacement, concrete curb and gutter, concrete sidewalk and curb ramp replacement, signing and pavement markings, replacement of TMS and signal vehicle detection loops, improvements to pedestrian signals, and intersection lighting on State Road 35 from 9th Street NW to North of Oak Hammock Loop in Polk County. Railroad Insurance Required Question Deadline 08/21/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 004 - Resurfacing - SR 35

Award

Roads / Highways

$12,838,286.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

334

7

6

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
85
Bidding Soon
2,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

October 28, 2024

Project location map

FL-35, Lakeland, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.