BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kinston, Alabama. Completed plans call for site work for a water / sewer project.

Principal Items of Work Include Potable Water Main Relocation and Associated Appurtenances Throughout the Intersection of Alabama Highway 52, Alabama Highway 153, and Geneva County Road 5. All Work Shall Be Completed Within 60 Consecutive Calendar Days. A Performance Bond and a Payment Bond Each in the Amount of One Hundred (100) Percent of the Contract Price, With a Corporate Surety Approved by the Owner, Will Be Required From the Contractor for the Faithful Performance and Payment of All Obligations Under the Contract Documents. Each Bidder Must Be Licensed as a Contractor in the State of Alabama in Accordance With Provisions of Chapter 8 of Title 34 of the Code of Alabama, and Must Submit With His Bid Satisfactory Evidence of Such License. Bidders Will Not Be Required to Prequalify. All Bidders Must Comply With the Requirements of the Contractor's Licensing Law of the State of Alabama and Be Certified for the Type of Work for Which a Proposal is Submitted. The Submission of the Bidder's Current State of Alabama License Number Will Be Required Before His/her Bid Will Be Received or Considered. No Bidder May Withdraw His Bid Within 60 Days After Actual Date of Opening Thereof. The Owner Reserves the Right to Reject Any or All Bids and to Waive Any Informalities. Each Bidder Must Deposit With His Bid, Security in the Amount, Form and Subject to the Conditions Provided in the Information for Bidders. **Document Notes: Upon Prior Payment of a Non-refundable Copy Fee in the Sum of One Hundred Dollars ($100.00) for Each Set of Documents. No Partial or "Split Sets" Will Be Issued. All Checks for Copies of the Bidding Documents Shall Be Made Payable to Driskell Engineering, Inc. Locator wire shall be 10 gauge insulated installed 18" to 24" above the pipe. All locator wire shall be spliced together to form a continuous circuit. The splice shall be made with connectors and insulated. Continuity check shall be performed by the CONTRACTOR upon completion of the system. CONTRACTOR shall make any repairs necessary to ensure that the locator wire is properly connected throughout the system.

Occupancy

Water / Sewer

$123,500.00

Public - City

Site Work

8

12

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
21
Bidding Soon
419
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 23, 2024

img_map_placeholder

AL-52, Kinston, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.