BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a civil project in Celina, Texas. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; and water / sewer project.

As of September 25, 2024 project was awarded to McMahon Contracting LP, awarded amount is $7,985,398.40. Construction of New Roadway from the intersection FM 455 and Celina Parkway, to Approximately 4,000 LF North of County Road 57 / Future J Fred Smith Pkwy. This project includes a 740 LF bridge, 10" reinforced Concrete Pavement Section, Storm Drain System, and 18 waterline. The project includes Bridge, Roadway, and Utility Construction in accordance with the plans and specifications for Celina Parkway (FM 455 to CR 57). The Owner, Uptown Celina Partners LP on behalf of Uptown Municipal Utility District No. 1 of Collin County, will be the Payor for the contract for Uptown Municipal Utility District No. 1 of Collin County. Each Bid must be accompanied by a Bid Bond or a certified cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The successful Bidder, if any, will be the responsible Bidder which in the Board's judgement will be most advantageous to the District and result in the best and most economical completion of the Project. The deadline to ask questions is 8/16/2024 5:00 PM CDT Property located between FM 455 and County Road 57. Scope of Work of the Contract includes: Construction of New Roadway from the intersection FM 455 and Celina Parkway, to Approximately 4,000 LF North of County Road 57 / Future J Fred Smith Pkwy. This project includes a 740 LF bridge, 10 reinforced Concrete Pavement Section, Storm Drain System, and 18 waterline. Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit an email request to tmoss@pape-dawson.com for such information to Engineer not less than 2 calendar days before the Bid opening. Description of Work. a. b. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Roadway Construction (2) Bridge Construction (3) Storm Drainage System Construction (4) 18 Waterline Construction

Award

Roads / Highways

$7,985,398.00

Public - County

New Construction, Paving, Site Work

212

18

220

7

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
75
Bidding Soon
3,495
All Active Projects
1,345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 21, 2024

img_map_placeholder

S Celina Pkwy, Celina, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.