Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Celina, Texas. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; and water / sewer project.
As of September 25, 2024 project was awarded to McMahon Contracting LP, awarded amount is $7,985,398.40. Construction of New Roadway from the intersection FM 455 and Celina Parkway, to Approximately 4,000 LF North of County Road 57 / Future J Fred Smith Pkwy. This project includes a 740 LF bridge, 10" reinforced Concrete Pavement Section, Storm Drain System, and 18 waterline. The project includes Bridge, Roadway, and Utility Construction in accordance with the plans and specifications for Celina Parkway (FM 455 to CR 57). The Owner, Uptown Celina Partners LP on behalf of Uptown Municipal Utility District No. 1 of Collin County, will be the Payor for the contract for Uptown Municipal Utility District No. 1 of Collin County. Each Bid must be accompanied by a Bid Bond or a certified cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The successful Bidder, if any, will be the responsible Bidder which in the Board's judgement will be most advantageous to the District and result in the best and most economical completion of the Project. The deadline to ask questions is 8/16/2024 5:00 PM CDT Property located between FM 455 and County Road 57. Scope of Work of the Contract includes: Construction of New Roadway from the intersection FM 455 and Celina Parkway, to Approximately 4,000 LF North of County Road 57 / Future J Fred Smith Pkwy. This project includes a 740 LF bridge, 10 reinforced Concrete Pavement Section, Storm Drain System, and 18 waterline. Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit an email request to tmoss@pape-dawson.com for such information to Engineer not less than 2 calendar days before the Bid opening. Description of Work. a. b. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Roadway Construction (2) Bridge Construction (3) Storm Drainage System Construction (4) 18 Waterline Construction
Award
Roads / Highways
$7,985,398.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
October 21, 2024
S Celina Pkwy, Celina, TX
Related To This Project
Celina, TX
Bid Date: Aug 08 2024
Celina, TX
Bid Date: Aug 22 2024
Celina, TX
--
Celina, TX
Bid Date: Sep 05 2024
Celina, TX
--
Celina, TX
Bid Date: Sep 06 2024
Celina, TX
Bid Date: Sep 11 2024
Celina, TX
--
Celina, TX
Bid Date: Jul 29 2024
Celina, TX
Bid Date: Jul 23 2024
Celina, TX
Bid Date: Jul 25 2024
Celina, TX
Bid Date: Jul 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.