BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santa Cruz, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of September 25 , 2024 , this project has been cancelled due to no bids received and no plan to rebid. Description of Work: Includes restriping UCSC main campus streets, including center and edge lines, bike lanes on main streets, refreshment of most crosswalks, pavement markings, intersection stop legends with limit lines and speed bumps. Bidders may be required to submit qualifications with their bids as set forth in the Supplementary Instructions to Bidders. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00 PM on August 9, 2024 and addressed only to: Alex Yasbek ayasbek@ucsc.edu The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: CSLB Lic. C32 Parking and Highway Improvement Contractor. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage ($15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Estimated construction cost: $414,823 (Base Bid). Scope of Work: 1. 2. 3. 4. Base Bid: Includes restriping UCSC main campus streets, including center and edge lines, bike lanes on main streets, refreshment of most crosswalks, pavement markings, intersection stop legends with limit lines and speed bumps. All work to be performed in accordance with drawings prepared by Bowman and Williams, dated December 5, 2023. Alternate 01: includes restriping of centerlines and fog lines, crosswalks, stop bars and other pavement markings located at the Coast Science Campus as indicated on drawings. Alternate 02: includes installing two hundred and sixty new sharrow markings at various locations at UCSC main campus. The work to be done includes all labor, tools and equipment necessary to furnish and install all materials and equipment shown on the drawings and described herein and to perform tests described herein, to provide complete and operating systems to the extent specified and shown on the drawings. The Contractor shall furnish all equipment, material and supplies, except where specifically noted as existing or supplied by The University. Location of Work: University of California Santa Cruz, California Campus, throughout Main Residential Campus and Coastal Science Campus.

Final Planning

Roads / Highways

$414,823.00

Public - State/Provincial

Paving, Site Work

21

19

19

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
109
Bidding Soon
2,242
All Active Projects
944
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 20, 2024

February 11, 2025

img_map_placeholder

Multiple Locations, Santa Cruz, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.