BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.

The Facilities and Community Services Department, Streets Division is responsible for the traffic signal maintenance and upkeep. The City is soliciting proposals from a qualified firm to prepare recommendations, costs, and a draft scope of work and provide Traffic Signal Timing sheet documentation and California Manual of Uniform Traffic Control Device (CAMUTCD) compliance review. The City is seeking assurance that clearance intervals for the City's traffic signals are CAMUTCD compliant and that the City has appropriate traffic signal timing sheet documentation. The selected firm shall document traffic signal timing charts and provide a compliance review of clearance intervals for 74 City traffic signals as identified Recommended Scope of Work The selected Proposer will document traffic signal timing charts and provide a compliance review of clearance intervals for 74-City traffic signals as identified by City staff. The total number of intersections will not exceed 74-signalized intersections. The City will provide information and field support as needed to complete the work. This proposed Scope of Work has been divided into two tasks: Task 1: Document Existing Traffic Signal Timing o Prepare an inventory of existing signal timing charts for 74 signalized intersections selected by the City. It is anticipated that a significant portion of the traffic signals selected by the City will be accessible through the City's traffic signal cabinets. The selected firm will upload traffic signal timing from each signalized intersection. The selected firm will visit the intersections in the field and upload existing programmed traffic signal timing directly from the traffic signal controller. The selected firm will create a database of controller timing sheet data for City review and future use current and final traffic signal timing charts (electronic PDF format) for each of the City identified traffic signals will be provided on a data storage media device acceptable to the City. Task 2: Review of Selected Signal Timing Parameters o The selected firm will review clearance intervals for each of the traffic s signals identified in Task. Any parameters or clearance intervals that may not meet City provided standards or those outlined in the CAMUTCD will be identified and recommendations for change will be provided to the City for their consideration and appropriate action. Minimum Staff Qualifications o The work outlined above will be completed and/or overseen by a certified IMSA Level 3 Specialist who is proficient in the conduct of such work on the Siemens and Econoline Signal Systems Software and with Siemens/Econolite traffic signal control equipment and SEPAC software. The certified Specialist will be utilizing the latest software programs compatible with the City's existing Siemens/Econolite controllers in the field. Online Q&A Yes Q&A Deadline 08/19/2024 4:00 PM (PDT) Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Project Type RFP (Request for Proposal) Response Types Cost File Type of Award Lump Sum The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
93
Bidding Soon
2,105
All Active Projects
955
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

img_map_placeholder

Multiple Locations, Redlands, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.