Renovation of a water / sewer project in Millbrae, California. Completed plans call for the renovation of a water / sewer project.
The project involves the full rehabilitation of a wet well facility, beginning with mobilization, site setup, and general conditions work including traffic control, safety, project management, and coordination. The contractor will design and implement a temporary stormwater bypass system to allow for uninterrupted work during wet well improvements. The existing wet well equipment including trash racks, discharge and inlet piping, screens, ladders, and grating--will be removed and replaced with new components, including stainless steel and HDPE piping, new grating, hatches, structural beams, davit arms, and ladders. Electrical improvements include removal of the existing electrical shed and equipment, installation of a new outdoor-rated switchboard, and upgrades to all electrical and control systems including a generator interface. The project concludes with full startup, testing, commissioning, and staff training to ensure proper function and long-term maintainability of the rehabilitated system. The general prevailing rates of per diem wages and the general prevailing rates for regular (straight) time, holiday, and overtime work in San Mateo County for each craft, classification, and type of worker needed to execute the Contract shall be as set forth in the current General Prevailing Wage Determinations made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, Sections 1770, 1773, and 1773.1 and any amendments thereof. The current General Prevailing Wage Determinations are incorporated into the Contract and are available at the California Department of Industrial Relations' website (www.dir.ca.gov/DLSR/PWD/index.htm) or upon request from the City. A certified check or corporate surety bond of not less than ten percent (10%) of the amount bid for the total cost of the project must accompany each proposal.a Payment Bond and Performance Bond, in the amount of 100% of the contract amount, meeting all requirements of said Contract Documents and approved by the City Attorney. The Millbrae City Council reserves the right to accept or reject any and all bids, alternate bids, or unit prices and/or waive any irregularities in any bid received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/21/2025 at 5:00 PM PT The work to be performed under this contract consists of the following major items of work as listed below and as further described in the solicitation documents: The Contractor shall perform all work and furnish all labor, materials, tools, equipment, machinery, services, transportation, incidentals and appurtenances required to complete construction and installation of the SFO PUMP STATION REHABILITATION PROJECT all in full compliance with the Contract Documents referred to herein. Engineer's Estimate: $600,000 - $800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion- (479) calendar days
Award
Water / Sewer
$519,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
September 26, 2025
5 El Camino Real, Millbrae, CA
Related To This Project
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
Bid Date: Aug 23 2024
Millbrae, CA
Bid Date: Sep 04 2024
Millbrae, CA
Bid Date: Oct 03 2024
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
Bid Date: Sep 24 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.