BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Site work and paving for a mixed-use development in Villa Park, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

A. This work shall consist of the complete removal of all items called for in the plans and specifications or as otherwise implied in a safe and orderly manner creating as little disturbance as possible. B. All areas indicated for construction of any kind shall be cleared of any debris, undergrowth, weeds, stumps, roots, and marked trees which might interfere with the progress of that work. Unmarked trees or any plant material indicated to be saved by the Owner or Owner's Representative shall be given special protection as specified. Work generally includes asphalt paving, asphalt color coat, concrete paving, playground equipment, poured-in-place surfacing, playground underdrainage, chain-link fence, ornamental fence, pergola, picnic shelter, site furnishings, landscape, and lawn restoration. Minority business firms are encouraged to submit bids. Successful contract bidders are also encouraged to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Lands Acquisition & Development" (OSLAD) grant program. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All contracts for work herein are subject to all Village rules and regulations, and providing for the payment of DuPage County's prevailing wage rate to all workers involved in these projects. All bids will remain firm for 60 days a er the bid opening. The Village of Villa Park reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Village.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,040,000.00

Public - City

Paving, Site Work

23

16

6

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
246
Bidding Soon
3,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

October 21, 2024

Project location map

320 E Wildwood Ave, Villa Park, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.