BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Villa Park, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

A. This work shall consist of the complete removal of all items called for in the plans and specifications or as otherwise implied in a safe and orderly manner creating as little disturbance as possible. B. All areas indicated for construction of any kind shall be cleared of any debris, undergrowth, weeds, stumps, roots, and marked trees which might interfere with the progress of that work. Unmarked trees or any plant material indicated to be saved by the Owner or Owner's Representative shall be given special protection as specified. Work generally includes asphalt paving, asphalt color coat, concrete paving, playground equipment, poured-in-place surfacing, playground underdrainage, chain-link fence, ornamental fence, pergola, picnic shelter, site furnishings, landscape, and lawn restoration. Minority business firms are encouraged to submit bids. Successful contract bidders are also encouraged to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Lands Acquisition & Development" (OSLAD) grant program. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All contracts for work herein are subject to all Village rules and regulations, and providing for the payment of DuPage County's prevailing wage rate to all workers involved in these projects. All bids will remain firm for 60 days a er the bid opening. The Village of Villa Park reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Village.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,040,000.00

Public - City

Paving, Site Work

23

16

6

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
87
Bidding Soon
1,761
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

October 21, 2024

img_map_placeholder

320 E Wildwood Ave, Villa Park, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.