BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Marshalltown, Iowa. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

On 2900 mile of oaks ave, over south timber creek, at sw s9 t82 r18 County : Marshall As of November 6, 2025, the project is in Conceptual status. Anticipated letting Year is 2029. IADOT - Bridge Replacement on Oaks Ave *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.region6resources.org/wp-content/uploads/2024/08/R6-STIP-2025-2028-Final.pdf On 2900 mile of Oaks Ave, Over South Timber Creek, at SW S9 T82 R18 Project is included Region 6 Resource Partners Fiscal Year 2025-2028 Page no 27 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- On 2900 mile of oaks ave, over south timber creek, at sw s9 t82 r18 County : Marshall As of March 29, 2025, the project is in Conceptual status. Anticipated letting year is 2027. IADOT - Bridge Replacement on Oaks Ave *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$700,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
127
Bidding Soon
1,452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 5, 2027

Project location map

Oaks Ave, Marshalltown, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.