BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2024 at 8:00 PM

Updated September 14, 2024

Site work for a water / sewer project in Garden City, Kansas. Working plans call for site work for a water / sewer project.

2024 Stormwater Drainage Improvements1A All bids shall be made on printed forms, which may be obtained from the Utilities Service Center. No bidder may withdraw his bid for at least thirty (30) days after the scheduled closing time for the receipt of bids. The City reserves the right to reject any or all bids, to waive informalities, and to accept the bid deemed to be in the best interest of the public. Direct all questions on the bidding procedure and project information to: David Baca David.Baca@gardencityks.us (office) 620-276-1291 Utilities Service Center - 140 Harvest St. P.O. Box 998 Garden City, Kansas 67846 SCOPE The following specifications are for the construction, reconstruction and repair of concrete sidewalks, driveways, and alley approaches within the City of Garden City. On major construction contracts, additional or supplemental specifications and standards may be used. 2. SIDEWALKS All sidewalks shall be constructed of concrete as herein specified. Paving bricks, decorative concrete and other material may be used under certain conditions as approved by the Public Works Department. a) Residential sidewalk width shall be 5 feet wide or match existing within a block, and be a minimum of 5 inches thick. Sidewalks shall be 6 inches thick for residential driveways, 7 inches thick for commercial driveways and 8 inches thick for alley approaches. b) The Public Works Department will inspect forms before placement of concrete if requested by the contractor or required by the Public Works Department on the permit. It shall be the responsibility of the contractor to notify the Public Works Department 24-hours before form inspections are needed. c) The sidewalk shall set above the curb 3/16 inch for each foot of distance from the curb to the property side edge, with a maximum of 4 inches above the curb in residential districts, and shall have a slope of 3 /16 inch per foot (2% Maximum) towards the street. The maximum longitudinal slope shall be 1 inch per linear foot unless otherwise specifically approved by the Public Works Department

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

23

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
17
Bidding Soon
87
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

March 13, 2025

Project location map

Multiple Locations, Garden City, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.