Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Pope Army Airfield, North Carolina. Completed plans call for the renovation of a military facility.
Amendment 02 - Change Quote due date and make minor revision to SOW. This project requirement is to Install Handicap Platform Lift, this is a Design Build requirement. Notice to Vendors: Funds are not presently available for this effort. Refer to the Statement of Work for detailed project requirements and the Combined Synopsis/Solicitation document for additional information on instructions and terms and conditions of this RFQ.Site Visit: A site visit is scheduled for August 8, 2024, at 1000 EDT. Vendors will meet at Bldg. 309, 259 Maynard St., Pope AAF NC. To confirm attendance and/or for additional information contact Mr. Aaron Brown, at aaron.brown.103us.af.mil or 910-394-1086. Questions due date: August 13, 2024, NLT 1:00 PM EDT. Questions received after this date/time may not receive a Government response. Send all questions to Marc.Lopez.2us.af.mil RFQ due date: August 22, 2024 RFQ due time: 2:00 PM EDT Email RFQ submission to Marc.Lopez.2us.af.mil THE QUOTE MUST BE SENT TO THE EMAIL ADDRESS ABOVE. ANYTHING OTHERWISE CAN AND WILL BE CONSIDERED NONRESPONSIVE. YOU MAY WISH TO PLACE A READ/DELIVERY RECEIPT AND/OR REQUEST ACKNOWLEDGEMENT OF YOUR SUBMITTAL. Note: .zip files are not an acceptable format for the Air Force Network and will not go through our email system. (xvi) For information regarding this RFQ contact Marc Lopez at Marc.Lopez.2us.af.mil Scope of Work: This job includes all labor, materials and equipment required for full performance of the work. The scope of work of this contract includes, but it not limited to the following specific items of work: A. GENERAL: This is a Design Build Contract; the contractor shall subcontract with an A-E firm to complete instruments of service prior to commencement of the construction. The AE Contractor is a Subcontractor of the Prime Contractor; the Prime Contractor shall ensure that the requirements of the contract are met. The contractor shall furnish all Architect-Engineer services, labor, materials, and equipment required to perform all requirements of the job. i. All work shall conform to the most current version of: UFC 1-200-01 DoD Building Code current based on the date of the contract award and as amended by more stringent requirements in this SOW. The job includes all labor, materials and equipment required for full performance of the work. ii. Contact Documents shall be signed and sealed by an Architect or Professional Engineer as applicable to the discipline. B. DESIGN: Design Services and Submittal Requirements. The Savannah District Design Manual for Military Construction (SAS DM) provides detailed guidance for preparation of all work under this contract. All designs shall be delivered to Fort Liberty using CAD technology, SpecsIntact software for contract specifications. Submittal requirements for each phase of design are defined in the
Award
Military
$94,226.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2024
October 1, 2024
259 Maynard St, Pope Army Airfield, NC
Related To This Project
Pope Army Airfield, NC
Bid Date: Aug 23 2024
Pope Army Airfield, NC
Bid Date: May 28 2024
Pope Army Airfield, NC
--
Pope Army Airfield, NC
Bid Date: Nov 20 2023
Pope Army Airfield, NC
Bid Date: Nov 07 2023
Pope Army Airfield, NC
Bid Date: Oct 16 2023
Pope Army Airfield, NC
Bid Date: Sep 14 2022
Pope Army Airfield, NC
Bid Date: Sep 06 2023
Pope Army Airfield, NC
Bid Date: Jul 27 2023
Pope Army Airfield, NC
--
Pope Army Airfield, NC
Bid Date: Apr 24 2023
Pope Army Airfield, NC
Bid Date: Oct 23 2020
Pope Army Airfield, NC
Bid Date: Aug 15 2022
Pope Army Airfield, NC
Bid Date: Sep 22 2022
Pope Army Airfield, NC
Bid Date: May 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.