BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Monterey Park, California. Completed plans call for the renovation of a educational facility.

Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Scope of Services: Furnish all labor and equipment needed to remove condenser tubes. Prepare the tubes and surfaces to include grit blasting and Belzona coating in the condenser. Provide all new copper tubes that meet or exceed Trane factory specifications for Chiller #3 in this scope of work. Prepare all tube sheets for new tubes. Clean out the existing condenser barrel from all debris that may be left over from the broken impeller. Install new tubes Scrap tubes shall remain on site for ELAC's disposal. Pressure test and leak check assembly after installation. Note that the chiller is currently disassembled and under repair. The awarding contractor for this project shall coordinate with existing onsite contractor for both scopes of work and arrange for testing of the overall equipment. Question Deadline 08/05/2024 at 5:00 PM PT Online Q&A Yes The Prime Contractors and its Subcontractors shall make a good faith effort to meet the thirty percent (30%) participation by Local, Small, Emerging and Disabled Veteran (LSEDV) businesses on the project.

Award

Educational

$209,762.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
255
Bidding Soon
3,749
All Active Projects
1,637
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 9, 2024

September 9, 2024

October 9, 2024

img_map_placeholder

1301 Avenida Cesar Chavez, Monterey Park, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.