BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and addition to a mixed-use development in Marblehead, Massachusetts. Working plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of October 1, 2024, the project is on hold indefinitely. No definite date for the rebid. Estimated Cost $141,000.00 Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. COA- Building addition - 10 Humphrey Street, Marblehead Mass This project includes: 1. The demolition of an existing three season structure including the foundation and a portion of the existing side walk. 2. Construction of a new approximately 13'x29' one story structure & modifications to the opening from the existing structure 3. Other work as shown in these drawings. A minority employee workforce hour goal of 10 percent. 2. A woman employee workforce hour goal of 6.9 percent. 3. A goal of 8.25 percent participation of minority-owned business enterprise. 4. A goal of 2.09 percent participation of woman-owned business enterprises. SCOPE OF WORK/LOCATION OF WORK: 2.1 The work shall consist of: 1.) The demolition of an existing three season structure including the foundation and a portion of the existing sidewalk. 2.) Construction of a new approximately 13'x29' one story structure & modifications to the opening from the existing structure 3.) Other work as shown in these drawings Attachment A - Sample Contract Attachment B - Prevailing Wage Attachment C - Specifications Attachment D - Drawings 2.2 The work includes furnishing all labor, materials, equipment and incidentals for completing the work as specified or reasonably implied by trade practice, as determined by the Owner. 2.3 The OWNER reserves the right to eliminate elements of the work or parts of sections, as may be determined by them as a basis of award, to keep within the limits of available funds, and/or add to sections of the work previously eliminated The demolition of an existing three season structure. Construction of a new 13'x29' one story structure & modifications to existing building Question Deadline Aug 13, 2024

Final Planning

Municipal

$189,848.00

Public - City

Addition, Demolition, New Construction, Paving, Site Work

16

5

6

4

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
142
Bidding Soon
2,499
All Active Projects
1,051
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

April 7, 2025

img_map_placeholder

10 Humphrey St, Marblehead, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.