Renovation of a water / sewer project in Beulah, Michigan. Completed plans call for the renovation of a water / sewer project.
Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports. 1. Locations: Notations are made in various places on the Drawings to call attention to building demolition which is required; however, these Drawings are not intended to show every item to be removed. The Contractor and the Subcontractors for the various trades must remove the materials related to their respective trades as required to permit the construction of the new Work as shown. 2. Permits: The Contractor must secure from the appropriate agencies all required permits necessary for proper execution of the work before starting work on the project site. All fees for securing the permits must be paid by the Contractor, including all inspection costs which may be legally assessed by the Bureau of Construction Codes in accordance with the authority granted under the Public Act 1980 PA 371, as amended. 3. Enclosures: Where it is necessary to make alterations to walls, floors or roof of the existing building, the Contractor must provide and maintain dustproof partitions to separate the parts where Work is being done from the adjoining parts occupied by the State Agency. Where any parts are opened and exposed to the elements, the Contractor must provide weather tight enclosures to fully protect the structure and its contents. 4. Waste Management Plan: The management plan must address waste source identification and separation, returns, reuse and salvage, recycling, landfill options, alternatives to landfilling, materials handling procedures and transportation. Please do not submit online questions via online. ALL questions should be emailed to Kendra Thompson at Thompson.kendra@sbcglobal.net no later than 12:00 p.m., Eastern on August 15, 2024. 5% Bid Security All work required for the replacement of primary switches and primary transformers with new primary transformers with integral 4-position switches, replacement of old underground primary electrical cabling and upgrades to the wastewater pump building to include replacement of existing pumps, motors, flow meter and associated piping and valves and other incidental work as associated with the completed project design intent as outlined on drawings and specifications. Platte River State Fish Hatchery - Primary Electric & Wastewater Pumphouse Project 15210 U.S. 31, Beulah, MI 49617
Award
Water / Sewer
$303,825.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2024
October 1, 2024
15210 US-31, Beulah, MI
Related To This Project
Beulah, MI
Bid Date: Nov 15 2024
Beulah, MI
Bid Date: Nov 22 2024
Beulah, MI
--
Beulah, MI
Bid Date: May 23 2024
Beulah, MI
Bid Date: Apr 30 2024
Beulah, MI
Bid Date: Apr 02 2024
Beulah, MI
Bid Date: Oct 27 2023
Beulah, MI
Bid Date: Aug 04 2023
Beulah, MI
Bid Date: May 17 2023
Beulah, MI
Bid Date: Mar 28 2023
Beulah, MI
Bid Date: Mar 28 2023
Beulah, MI
Bid Date: Mar 07 2023
Beulah, MI
Bid Date: Mar 07 2023
Beulah, MI
Bid Date: Aug 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.